X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385032111003

Well Details

Well ID: 0385032111003
Loading map...
Location: 00/11-21-038-03W5/3
Location Alias: 00/11-21-38-03 W5M
Location Alias 2: 00/11-21-038-03 W5/03
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 03
Section: 21
County/Municipality: Lacombe County
Well Name: NAL SYLAKE 11-21-38-3
Operator Name: NAL Resources Limited
License Number: 0151137
License Date: 1991-12-20
License Status: Issued
Spud Date: 1992-01-07
Final Drill Date: 1992-01-25
Well Total Depth: 2255.00 m
Surface Hole Latitude: 52.284858
Surface Hole Longitude: -114.373121

For data sources see[1][2]

Well History

Date Event
1991-12-20 Obtained License
1992-01-08 Surface Casing Operation Performed
1992-01-16 Well Log Performed
1992-01-18 Drill Stem Test Performed
1992-01-19 Drill Stem Test Performed
1992-01-25 Finished Drilling
1992-01-26 Production Casing Operation Performed
1992-01-27 Rig Released
1992-02-19 Perforation Treatment Performed - Jet Perforation
1992-02-19 Well Log Performed
1992-02-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-02-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-02-25 Perforation Treatment Performed - Jet Perforation
1992-02-25 Well Log Performed
1992-03-03 Perforation Treatment Performed - Cement Squeeze
1992-03-04 Perforation Treatment Performed - Jet Perforation
1992-03-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-03-11 Perforation Treatment Performed - Cement Squeeze
1992-03-12 Perforation Treatment Performed - Jet Perforation
1992-03-12 Well Log Performed
1992-03-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-03-18 Perforation Treatment Performed - Fractured
1992-03-18 Perforation Treatment Performed - Jet Perforation
1992-03-18 Well Log Performed
1992-03-20 Perforation Treatment Performed - Fractured
1992-03-20 Perforation Treatment Performed - Jet Perforation
1992-03-20 Well Log Performed
1992-03-24 Perforation Treatment Performed - Jet Perforation
1992-03-24 Well Log Performed
1992-03-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-03-25 Perforation Treatment Performed - Cement Squeeze
1992-03-26 Perforation Treatment Performed - Fractured
1992-03-26 Perforation Treatment Performed - Jet Perforation
1992-03-30 Perforation Treatment Performed - Fractured
1992-05-25 Well Log Performed
1992-12-01 Perforation Treatment Performed - Fractured
1996-03-25 Well Log Performed
1996-03-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-03-26 Plug Back Performed
1996-03-26 Well Log Performed
1996-03-27 Perforation Treatment Performed - Jet Perforation
1996-03-28 Perforation Treatment Performed - Remedial Casing
1996-03-29 Well Log Performed
1996-03-30 Perforation Treatment Performed - Jet Perforation
1996-03-30 Well Mode changed to Drilled and Cased
1998-03-18 Well Log Performed
1998-05-22 Well Log Performed
1998-06-11 Perforation Treatment Performed - Jet Perforation
1998-06-25 Perforation Treatment Performed - Cement Squeeze
1998-06-25 Plug Back Performed
2006-06-01 Perforation Treatment Performed - Cement Squeeze
2006-06-14 Perforation Treatment Performed - Jet Perforation
2006-06-14 Well Log Performed
2006-06-20 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-02-19 Perforation 2216.00 2218.00 16
1992-03-12 Perforation 2217.00 2218.00 18
1992-03-13 Acid Treatment 2217.00 2218.00 0
1992-03-18 Perforation 2199.00 2201.00 17
1992-03-18 Fracture 2199.00 2201.00 0
1992-03-20 Perforation 2197.00 2199.00 17
1992-03-20 Perforation 2201.00 2207.50 17
1992-03-20 Fracture 2197.00 2207.50 0
1992-03-24 Perforation 2208.90 2210.10 16
1992-03-25 Acid Treatment 2208.90 2210.10 0
1992-03-25 Cement Squeeze 2208.80 2210.10 0
1992-02-20 Acid Treatment 2216.00 2218.00 0
1992-03-26 Perforation 2197.00 2207.50 16
1992-03-26 Fracture 2197.00 2207.50 0
1992-03-26 Fracture 2197.00 2207.50 0
1992-03-30 Fracture 2197.00 2207.50 0
1992-12-01 Fracture 2197.00 2207.50 0
1996-03-26 Packing Device Capped w/Cement 2179.90 2190.00 0
1996-03-27 Perforation 385.00 386.00 14
1996-03-28 Remedial Casing Cementing 385.00 386.00 0
1996-03-30 Perforation 418.60 424.00 17
1998-06-11 Perforation 391.00 392.00 14
1992-02-25 Perforation 2213.00 2214.00 16
1998-06-11 Perforation 407.60 408.60 14
1998-06-25 Cement Squeeze 391.00 408.60 0
2006-06-01 Cement Squeeze 418.50 424.00 0
2006-06-14 Perforation 1996.20 2004.00 17
2006-06-20 Fracture 1996.20 2004.00 0
1992-02-25 Perforation 2215.00 2216.00 16
1992-02-25 Acid Treatment 2213.00 2216.00 0
1992-03-03 Cement Squeeze 2213.00 2218.00 0
1992-03-04 Perforation 2216.00 2218.00 16
1992-03-05 Acid Treatment 2216.00 2218.00 0
1992-03-11 Cement Squeeze 2216.00 2218.00 0

For data sources see[4]



References