X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385032110000

Well Details

Well ID: 0385032110000
Loading map...
Location: 00/10-21-038-03W5/0
Location Alias: 00/10-21-38-03 W5M
Location Alias 2: 00/10-21-038-03 W5/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 03
Section: 21
County/Municipality: Lacombe County
Well Name: CVE SYLAKE 10-21-38-3
Operator Name: Cenovus Energy Inc.
License Number: 0022993
License Date: 1962-09-12
License Status: Suspension
Spud Date: 1962-09-18
Final Drill Date: 1962-10-05
Well Total Depth: 2240.30 m
Surface Hole Latitude: 52.284433
Surface Hole Longitude: -114.366995

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-09-12 Obtained License
1962-10-04 Drill Stem Test Performed
1962-10-05 Finished Drilling
1962-10-05 Well Mode changed to Drilled and Cased
1962-10-07 Production Casing Operation Performed
1962-10-26 Perforation Treatment Performed - Bullet Perforation
1962-10-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-11-01 Well Began Production
1962-11-01 Well Fluid changed to Crude Oil
1962-11-01 Well Mode changed to Flowing
1976-04-03 Well Fluid changed to Crude Oil
1976-04-03 Well Mode changed to Pumping
1989-09-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-11-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-09-09 Perforation Treatment Performed - Cement Squeeze
1992-09-10 Perforation Treatment Performed - Jet Perforation
1992-09-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-09-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-07-18 Well Log Performed
1996-07-24 Well Log Performed
1996-07-29 Well Log Performed
1996-08-01 Well Log Performed
1996-09-01 Well Began Injection
1996-09-01 Well Fluid changed to Water
1996-09-01 Well Type changed to Injection
1996-09-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-06-26 Well Fluid changed to Water
2007-06-26 Well Mode changed to Suspended
2007-06-26 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-10-26 Bullet Perforation 2217.10 2221.40 7
1962-10-27 Acid Treatment 2217.10 2221.40 0
1989-09-21 Acid Treatment 2217.10 2221.40 0
1991-11-16 Acid Treatment 2217.10 2221.40 0
1992-09-09 Cement Squeeze 2217.10 2221.40 0
1992-09-10 Perforation 2215.00 2217.70 18
1992-09-11 Acid Treatment 2215.00 2217.70 0
1992-09-16 Acid Treatment 2215.00 2217.70 0
1996-09-21 Acid Treatment 2215.00 2217.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 3158 0.0 0.0 0.0
1968 2377 0.0 0.0 0.0
1969 5609 0.0 0.0 0.0
1970 3820 0.0 0.0 0.0
1971 5598 0.0 0.0 0.0
1972 7970 0.0 0.0 0.0
1973 8672 0.0 0.0 0.0
1974 8759 0.0 0.0 0.0
1975 8627 0.0 0.0 0.0
1976 7988 0.0 0.0 0.0
1977 8590 0.0 0.0 0.0
1978 7345 0.0 0.0 0.0
1979 7870 0.0 0.0 0.0
1980 7418 0.0 0.0 0.0
1981 7989 0.0 0.0 0.0
1982 8104 0.0 0.0 0.0
1983 8656 0.0 0.0 0.0
1984 8727 0.0 0.0 0.0
1985 8444 0.0 0.0 0.0
1986 8273 0.0 0.0 0.0
1987 8360 0.0 0.0 0.0
1988 8308 0.0 0.0 0.0
1989 8149 0.0 0.0 0.0
1990 7826 0.0 0.0 0.0
1991 7534 0.0 0.0 0.0
1992 7453 0.0 0.0 0.0
1993 7932 0.0 0.0 0.0
1994 7687 0.0 0.0 0.0
1995 7038 0.0 0.0 0.0
1996 1152 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0

For data sources see[5]

References