X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385032107000

Well Details

Well ID: 0385032107000
Loading map...
Location: 00/07-21-038-03W5/0
Location Alias: 00/07-21-38-03 W5M
Location Alias 2: 00/07-21-038-03 W5/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 03
Section: 21
County/Municipality: Lacombe County
Well Name: CVE SYLAKE 7-21-38-3
Operator Name: Cenovus Energy Inc.
License Number: 0179916
License Date: 1995-08-11
License Status: Suspension
Spud Date: 1995-08-29
Final Drill Date: 1995-09-10
Well Total Depth: 2255.00 m
Surface Hole Latitude: 52.280082
Surface Hole Longitude: -114.368064

For data sources see[1][2]

Well History

Date Event
1995-08-11 Obtained License
1995-08-31 Surface Casing Operation Performed
1995-09-10 Finished Drilling
1995-09-10 Well Mode changed to Drilled and Cased
1995-09-11 Drill Stem Test Performed
1995-09-11 Well Log Performed
1995-09-13 Production Casing Operation Performed
1995-09-14 Rig Released
1995-09-27 Perforation Treatment Performed - Jet Perforation
1995-09-27 Well Log Performed
1995-09-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-10-02 Perforation Treatment Performed - Cement Squeeze
1995-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-10-04 Perforation Treatment Performed - Jet Perforation
1995-10-04 Well Log Performed
1995-10-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-10-06 Perforation Treatment Performed - Jet Perforation
1995-10-06 Well Log Performed
1995-10-15 Well Began Production
1995-10-15 Well Fluid changed to Crude Oil
1995-10-15 Well Mode changed to Flowing
1995-11-25 Well Log Performed
1996-08-13 Well Log Performed
1996-08-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-09-26 Well Log Performed
1996-09-27 Perforation Treatment Performed - Cement Squeeze
1996-09-27 Perforation Treatment Performed - Jet Perforation
1996-09-28 Well Log Performed
1996-09-29 Perforation Treatment Performed - Jet Perforation
1996-09-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-10-02 Perforation Treatment Performed - Cement Squeeze
1996-10-03 Perforation Treatment Performed - Jet Perforation
1996-10-03 Well Log Performed
1997-03-01 Well Fluid changed to Crude Oil
1997-03-01 Well Mode changed to Suspended
1997-06-16 Well Fluid changed to Crude Oil
1997-06-16 Well Mode changed to Pumping
2003-01-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-01-13 Plug Back Performed
2003-01-13 Well Fluid changed to Crude Oil
2003-01-13 Well Log Performed
2003-01-13 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-09-27 Perforation 2214.50 2216.00 18
1996-09-27 Cement Squeeze 2224.00 2225.00 0
1996-09-29 Perforation 2201.00 2204.00 17
1996-09-30 Acid Treatment 2201.00 2204.00 0
1996-10-02 Cement Squeeze 2201.00 2204.00 0
1996-10-03 Perforation 2194.00 2198.50 17
2003-01-13 Packing Device Capped w/Cement 2182.00 2190.00 0
1995-09-28 Acid Treatment 2214.50 2216.00 0
1995-10-02 Cement Squeeze 2214.50 2216.00 0
1995-10-04 Perforation 2212.50 2214.00 18
1995-10-04 Acid Treatment 2212.50 2214.00 0
1995-10-06 Perforation 2209.00 2211.00 17
1995-10-06 Acid Treatment 2209.00 2211.00 0
1996-08-14 Acid Treatment 2205.00 2209.00 0
1996-09-27 Perforation 2224.00 2225.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 1492 0.0 0.0 0.0
1996 6757 0.0 0.0 0.0
1997 1176 0.0 0.0 0.0

For data sources see[5]

References