X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385032102002

Well Details

Well ID: 0385032102002
Loading map...
Location: 00/02-21-038-03W5/2
Location Alias: 00/02-21-38-03 W5M
Location Alias 2: 00/02-21-038-03 W5/02
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 03
Section: 21
County/Municipality: Lacombe County
Well Name: CVE SYLAKE 2-21-38-3
Operator Name: Cenovus Energy Inc.
License Number: 0023401
License Date: 1962-11-26
License Status: Abandoned
Spud Date: 1962-12-03
Final Drill Date: 1962-12-17
Well Total Depth: 2249.40 m
Surface Hole Latitude: 52.277226
Surface Hole Longitude: -114.367667

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-11-26 Obtained License
1962-12-15 Drill Stem Test Performed
1962-12-17 Finished Drilling
1962-12-17 Well Mode changed to Drilled and Cased
1962-12-19 Drill Stem Test Performed
1962-12-20 Production Casing Operation Performed
1962-12-22 Perforation Treatment Performed - Acid Wash - No Pressure
1962-12-22 Perforation Treatment Performed - Bullet Perforation
1963-01-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-01-25 Perforation Treatment Performed - Bullet Perforation
1963-01-25 Perforation Treatment Performed - Cement Plug
1963-01-26 Perforation Treatment Performed - Acid Wash - No Pressure
1963-03-17 Perforation Treatment Performed - Bullet Perforation
1963-05-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-07-09 Perforation Treatment Performed - Cement Squeeze
1963-07-12 Perforation Treatment Performed - Abrasa-Jet Perforation
1963-07-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-12-17 Perforation Treatment Performed - Jet Perforation
1969-12-18 Perforation Treatment Performed - Acid Wash - No Pressure
1969-12-22 Perforation Treatment Performed - Cement Squeeze
1970-01-03 Perforation Treatment Performed - Acid Wash - No Pressure
1970-01-03 Perforation Treatment Performed - Jet Perforation
1970-09-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-09-12 Perforation Treatment Performed - Jet Perforation
1970-09-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-09-13 Perforation Treatment Performed - Jet Perforation
1970-09-18 Well Began Production
1970-09-18 Well Fluid changed to Crude Oil
1970-09-18 Well Mode changed to Flowing
1982-03-23 Well Fluid changed to Crude Oil
1982-03-23 Well Mode changed to Suspended
1982-07-31 Well Fluid changed to Crude Oil
1982-07-31 Well Mode changed to Flowing
1984-12-01 Well Fluid changed to Crude Oil
1984-12-01 Well Mode changed to Suspended
1989-11-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-04-25 Perforation Treatment Performed - Cement Squeeze
1991-04-30 Perforation Treatment Performed - Fractured
1991-04-30 Perforation Treatment Performed - Jet Perforation
1991-05-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-03-03 Perforation Treatment Performed - Jet Perforation
2000-03-03 Well Log Performed
2000-03-04 Perforation Treatment Performed - Acid Wash - No Pressure
2000-03-09 Well Fluid changed to Crude Oil
2000-03-09 Well Mode changed to Flowing
2000-12-04 Well Fluid changed to Crude Oil
2000-12-04 Well Mode changed to Suspended
2011-06-26 Well Log Performed
2011-06-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-06-27 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2011-06-27 Plug Back Performed
2011-06-27 Well Fluid changed to Crude Oil
2011-06-27 Well Log Performed
2011-06-27 Well Mode changed to Abandoned Zone
2011-06-28 Perforation Treatment Performed - Jet Perforation
2011-06-28 Well Log Performed
2011-06-29 Perforation Treatment Performed - Cement Plug
2011-06-29 Perforation Treatment Performed - Remedial Casing
2011-06-30 Perforation Treatment Performed - Jet Perforation
2011-06-30 Well Log Performed
2011-07-02 Perforation Treatment Performed - Remedial Casing
2011-07-03 Perforation Treatment Performed - Jet Perforation
2011-07-03 Well Log Performed
2011-07-04 Well Log Performed
2011-07-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-07-06 Perforation Treatment Performed - Remedial Casing
2011-07-07 Well Log Performed
2011-07-12 Perforation Treatment Performed - Jet Perforation
2011-07-13 Perforation Treatment Performed - Remedial Casing
2011-12-11 Well Abandoned
2011-12-11 Well Fluid changed to Crude Oil
2011-12-11 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-12-22 Bullet Perforation 2221.40 2222.60 7
1963-07-09 Cement Squeeze 2209.80 2211.60 0
1963-07-12 Hydra Jet Perforation 2214.10 2214.10 0
1963-07-13 Acid Treatment 2214.10 2214.10 0
1969-12-17 Perforation 2201.30 2203.10 7
1969-12-18 Acid Wash 2201.30 2203.10 0
1969-12-22 Cement Squeeze 2201.30 2203.10 0
1969-12-22 Cement Squeeze 2214.40 2214.40 0
1970-01-03 Perforation 2216.80 2218.00 7
1970-01-03 Acid Wash 2216.80 2218.00 0
1970-09-12 Perforation 2214.70 2215.30 7
1962-12-22 Acid Wash 2221.40 2222.60 0
1970-09-12 Acid Treatment 2214.70 2215.30 0
1970-09-13 Perforation 2201.30 2201.90 7
1970-09-13 Perforation 2202.20 2203.70 7
1970-09-13 Perforation 2204.30 2205.80 7
1970-09-13 Acid Treatment 2201.30 2205.80 0
1989-11-01 Acid Treatment 2214.70 2218.00 0
1991-04-25 Cement Squeeze 2201.30 2218.00 0
1991-04-30 Perforation 2210.80 2213.50 13
1991-04-30 Perforation 2214.60 2215.60 13
1991-04-30 Fracture 2210.80 2215.60 0
1963-01-16 Acid Treatment 2221.40 2222.60 0
1991-05-01 Acid Treatment 2210.80 2215.60 0
2000-03-03 Perforation 2200.00 2205.50 17
2000-03-04 Acid Wash 2200.00 2205.50 0
2011-06-27 Packing Dev Cpd w/Res-Gyp Cem 2206.00 2209.00 0
2011-06-27 Packing Device Capped w/Cement 2185.00 2193.00 0
2011-06-28 Perforation 1028.00 1030.00 20
2011-06-29 Remedial Casing Cementing 1028.00 1030.00 0
2011-06-29 Cement Plug 940.00 1047.00 0
2011-06-30 Perforation 807.00 809.00 20
2011-07-02 Remedial Casing Cementing 807.00 809.00 0
1963-01-25 Cement Plug 2219.90 2219.90 0
2011-07-03 Perforation 542.00 544.00 20
2011-07-05 Acid Treatment 542.00 544.00 0
2011-07-06 Remedial Casing Cementing 542.00 544.00 0
2011-07-12 Perforation 269.00 270.00 20
2011-07-13 Remedial Casing Cementing 269.00 270.00 0
1963-01-25 Bullet Perforation 2217.10 2218.00 7
1963-01-26 Acid Wash 2217.10 2218.00 0
1963-03-17 Bullet Perforation 2209.80 2211.60 7
1963-05-03 Acid Treatment 2209.80 2211.60 0
1963-07-09 Cement Squeeze 2217.10 2218.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1970 796 0.0 0.0 0.0
1971 2156 0.0 0.0 0.0
1972 3547 0.0 0.0 0.0
1973 6680 0.0 0.0 0.0
1974 8624 0.0 0.0 0.0
1975 1712 0.0 0.0 0.0
1976 38 0.0 0.0 0.0
1977 240 0.0 0.0 0.0
1978 353 0.0 0.0 0.0
1979 504 0.0 0.0 0.0
1980 196 0.0 0.0 0.0
1981 48 0.0 0.0 0.0
1982 117 0.0 0.0 0.0
1983 297 0.0 0.0 0.0
2000 3730 0.0 0.0 0.0

For data sources see[5]

References