X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385032102000

Well Details

Well ID: 0385032102000
Loading map...
Location: 00/02-21-038-03W5/0
Location Alias: 00/02-21-38-03 W5M
Location Alias 2: 00/02-21-038-03 W5/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 03
Section: 21
County/Municipality: Lacombe County
Well Name: CVE SYLAKE 2-21-38-3
Operator Name: Cenovus Energy Inc.
License Number: 0023401
License Date: 1962-11-26
License Status: Abandoned
Spud Date: 1962-12-03
Final Drill Date: 1962-12-17
Well Total Depth: 2249.40 m
Surface Hole Latitude: 52.277226
Surface Hole Longitude: -114.367667

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-11-26 Obtained License
1962-12-15 Drill Stem Test Performed
1962-12-17 Finished Drilling
1962-12-17 Well Mode changed to Drilled and Cased
1962-12-19 Drill Stem Test Performed
1962-12-20 Production Casing Operation Performed
1962-12-22 Perforation Treatment Performed - Acid Wash - No Pressure
1962-12-22 Perforation Treatment Performed - Bullet Perforation
1963-01-01 Well Began Production
1963-01-01 Well Fluid changed to Crude Oil
1963-01-01 Well Mode changed to Flowing
1963-01-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-01-25 Perforation Treatment Performed - Bullet Perforation
1963-01-25 Perforation Treatment Performed - Cement Plug
1963-01-26 Perforation Treatment Performed - Acid Wash - No Pressure
1963-03-17 Perforation Treatment Performed - Bullet Perforation
1963-05-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-07-09 Perforation Treatment Performed - Cement Squeeze
1963-07-12 Perforation Treatment Performed - Abrasa-Jet Perforation
1963-07-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-12-17 Perforation Treatment Performed - Jet Perforation
1969-12-18 Perforation Treatment Performed - Acid Wash - No Pressure
1969-12-22 Perforation Treatment Performed - Cement Squeeze
1970-01-03 Perforation Treatment Performed - Acid Wash - No Pressure
1970-01-03 Perforation Treatment Performed - Jet Perforation
1970-09-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-09-12 Perforation Treatment Performed - Jet Perforation
1970-09-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-09-13 Perforation Treatment Performed - Jet Perforation
1970-09-18 Well Fluid changed to Crude Oil
1970-09-18 Well Mode changed to Flowing
1979-07-12 Well Fluid changed to Crude Oil
1979-07-12 Well Mode changed to Pumping
1989-11-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-04-25 Perforation Treatment Performed - Cement Squeeze
1991-04-30 Perforation Treatment Performed - Fractured
1991-04-30 Perforation Treatment Performed - Jet Perforation
1991-05-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-05-15 Well Fluid changed to Crude Oil
1992-05-15 Well Mode changed to Suspended
1994-10-24 Well Fluid changed to Crude Oil
1994-10-24 Well Mode changed to Pumping
1997-09-07 Well Fluid changed to Crude Oil
1997-09-07 Well Mode changed to Suspended
2000-03-03 Perforation Treatment Performed - Jet Perforation
2000-03-03 Well Log Performed
2000-03-04 Perforation Treatment Performed - Acid Wash - No Pressure
2011-06-26 Well Log Performed
2011-06-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-06-27 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2011-06-27 Plug Back Performed
2011-06-27 Well Fluid changed to Crude Oil
2011-06-27 Well Log Performed
2011-06-27 Well Mode changed to Abandoned Zone
2011-06-28 Perforation Treatment Performed - Jet Perforation
2011-06-28 Well Log Performed
2011-06-29 Perforation Treatment Performed - Cement Plug
2011-06-29 Perforation Treatment Performed - Remedial Casing
2011-06-30 Perforation Treatment Performed - Jet Perforation
2011-06-30 Well Log Performed
2011-07-02 Perforation Treatment Performed - Remedial Casing
2011-07-03 Perforation Treatment Performed - Jet Perforation
2011-07-03 Well Log Performed
2011-07-04 Well Log Performed
2011-07-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-07-06 Perforation Treatment Performed - Remedial Casing
2011-07-07 Well Log Performed
2011-07-12 Perforation Treatment Performed - Jet Perforation
2011-07-13 Perforation Treatment Performed - Remedial Casing
2011-12-11 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-12-22 Bullet Perforation 2221.40 2222.60 7
1963-07-09 Cement Squeeze 2209.80 2211.60 0
1963-07-12 Hydra Jet Perforation 2214.10 2214.10 0
1963-07-13 Acid Treatment 2214.10 2214.10 0
1969-12-17 Perforation 2201.30 2203.10 7
1969-12-18 Acid Wash 2201.30 2203.10 0
1969-12-22 Cement Squeeze 2201.30 2203.10 0
1969-12-22 Cement Squeeze 2214.40 2214.40 0
1970-01-03 Perforation 2216.80 2218.00 7
1970-01-03 Acid Wash 2216.80 2218.00 0
1970-09-12 Perforation 2214.70 2215.30 7
1962-12-22 Acid Wash 2221.40 2222.60 0
1970-09-12 Acid Treatment 2214.70 2215.30 0
1970-09-13 Perforation 2201.30 2201.90 7
1970-09-13 Perforation 2202.20 2203.70 7
1970-09-13 Perforation 2204.30 2205.80 7
1970-09-13 Acid Treatment 2201.30 2205.80 0
1989-11-01 Acid Treatment 2214.70 2218.00 0
1991-04-25 Cement Squeeze 2201.30 2218.00 0
1991-04-30 Perforation 2210.80 2213.50 13
1991-04-30 Perforation 2214.60 2215.60 13
1991-04-30 Fracture 2210.80 2215.60 0
1963-01-16 Acid Treatment 2221.40 2222.60 0
1991-05-01 Acid Treatment 2210.80 2215.60 0
2000-03-03 Perforation 2200.00 2205.50 17
2000-03-04 Acid Wash 2200.00 2205.50 0
2011-06-27 Packing Dev Cpd w/Res-Gyp Cem 2206.00 2209.00 0
2011-06-27 Packing Device Capped w/Cement 2185.00 2193.00 0
2011-06-28 Perforation 1028.00 1030.00 20
2011-06-29 Remedial Casing Cementing 1028.00 1030.00 0
2011-06-29 Cement Plug 940.00 1047.00 0
2011-06-30 Perforation 807.00 809.00 20
2011-07-02 Remedial Casing Cementing 807.00 809.00 0
1963-01-25 Cement Plug 2219.90 2219.90 0
2011-07-03 Perforation 542.00 544.00 20
2011-07-05 Acid Treatment 542.00 544.00 0
2011-07-06 Remedial Casing Cementing 542.00 544.00 0
2011-07-12 Perforation 269.00 270.00 20
2011-07-13 Remedial Casing Cementing 269.00 270.00 0
1963-01-25 Bullet Perforation 2217.10 2218.00 7
1963-01-26 Acid Wash 2217.10 2218.00 0
1963-03-17 Bullet Perforation 2209.80 2211.60 7
1963-05-03 Acid Treatment 2209.80 2211.60 0
1963-07-09 Cement Squeeze 2217.10 2218.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 2173 0.0 0.0 0.0
1968 1512 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 5915 0.0 0.0 0.0
1971 7582 0.0 0.0 0.0
1972 8737 0.0 0.0 0.0
1973 8491 0.0 0.0 0.0
1974 8570 0.0 0.0 0.0
1975 7612 0.0 0.0 0.0
1976 8370 0.0 0.0 0.0
1977 8130 0.0 0.0 0.0
1978 8134 0.0 0.0 0.0
1979 7738 0.0 0.0 0.0
1980 8488 0.0 0.0 0.0
1981 8613 0.0 0.0 0.0
1982 7777 0.0 0.0 0.0
1983 8381 0.0 0.0 0.0
1984 8107 0.0 0.0 0.0
1985 8614 0.0 0.0 0.0
1986 8396 0.0 0.0 0.0
1987 8707 0.0 0.0 0.0
1988 8759 0.0 0.0 0.0
1989 8252 0.0 0.0 0.0
1990 6735 0.0 0.0 0.0
1991 6807 0.0 0.0 0.0
1992 3172 0.0 0.0 0.0
1994 1612 0.0 0.0 0.0
1995 8583 0.0 0.0 0.0
1996 7976 0.0 0.0 0.0
1997 5909 0.0 0.0 0.0

For data sources see[5]

References