X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385032002000

Well Details

Well ID: 0385032002000
Loading map...
Location: 00/02-20-038-03W5/0
Location Alias: 00/02-20-38-03 W5M
Location Alias 2: 00/02-20-038-03 W5/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 03
Section: 20
County/Municipality: Lacombe County
Well Name: CVE SYLAKE 2-20-38-3
Operator Name: Cenovus Energy Inc.
License Number: 0024632
License Date: 1963-08-06
License Status: Abandoned
Spud Date: 1963-08-27
Final Drill Date: 1963-09-10
Well Total Depth: 2302.80 m
Surface Hole Latitude: 52.277200
Surface Hole Longitude: -114.391474

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-08-06 Obtained License
1963-09-10 Finished Drilling
1963-09-10 Well Mode changed to Drilled and Cased
1963-09-11 Drill Stem Test Performed
1963-09-12 Drill Stem Test Performed
1963-09-13 Production Casing Operation Performed
1963-09-21 Perforation Treatment Performed - Jet Perforation
1963-09-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-09-26 Perforation Treatment Performed - Acid Wash - No Pressure
1963-10-22 Well Began Production
1963-10-22 Well Fluid changed to Crude Oil
1963-10-22 Well Mode changed to Flowing
1964-03-01 Perforation Treatment Performed - Cement Squeeze
1964-03-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-03-04 Perforation Treatment Performed - Acid Wash - No Pressure
1964-03-04 Perforation Treatment Performed - Jet Perforation
1964-03-24 Well Fluid changed to Crude Oil
1964-03-24 Well Mode changed to Pumping
1978-03-01 Well Fluid changed to Crude Oil
1978-03-01 Well Mode changed to Suspended
1978-03-21 Well Fluid changed to Crude Oil
1978-03-21 Well Mode changed to Pumping
1986-11-01 Well Fluid changed to Crude Oil
1986-11-01 Well Mode changed to Suspended
1992-08-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-08-26 Perforation Treatment Performed - Fractured
1992-08-26 Perforation Treatment Performed - Jet Perforation
1992-08-26 Well Fluid changed to Crude Oil
1992-08-26 Well Log Performed
1992-08-26 Well Mode changed to Suspended
1992-09-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-04-22 Perforation Treatment Performed - Cement Squeeze
1994-04-27 Perforation Treatment Performed - Jet Perforation
1994-04-28 Perforation Treatment Performed - Cement Squeeze
1994-05-02 Well Log Performed
1994-05-03 Perforation Treatment Performed - Jet Perforation
1994-05-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-07-15 Well Began Injection
1994-07-15 Well Fluid changed to Water
1994-07-15 Well Type changed to Injection
1994-08-11 Well Log Performed
2008-11-23 Perforation Treatment Performed - Cement Squeeze
2008-11-23 Plug Back Performed
2008-11-23 Well Fluid changed to Water
2008-11-23 Well Mode changed to Abandoned Zone
2008-11-23 Well Type changed to Injection
2008-11-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-11-24 Perforation Treatment Performed - Jet Perforation
2008-11-24 Plug Back Performed
2008-11-24 Well Log Performed
2008-11-25 Perforation Treatment Performed - Jet Perforation
2008-11-25 Perforation Treatment Performed - Remedial Casing
2008-11-25 Well Log Performed
2008-11-26 Perforation Treatment Performed - Remedial Casing
2008-11-26 Well Log Performed
2008-11-27 Perforation Treatment Performed - Jet Perforation
2008-11-27 Perforation Treatment Performed - Remedial Casing
2008-11-29 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-09-21 Perforation 2241.20 2242.10 7
1992-08-26 Fracture 1980.60 1994.60 0
1992-09-24 Acid Treatment 1980.60 1994.60 0
1994-04-22 Cement Squeeze 1980.60 1994.60 0
1994-04-27 Perforation 2240.90 2241.50 13
1994-04-28 Cement Squeeze 2240.90 2241.50 0
1994-05-03 Perforation 2269.00 2275.00 13
1994-05-03 Perforation 2263.00 2269.00 13
1994-05-04 Acid Treatment 2269.00 2275.00 0
1994-05-04 Acid Treatment 2263.00 2269.00 0
2008-11-23 Cement Squeeze 2263.00 2275.00 0
1963-09-26 Acid Wash 2241.20 2242.10 0
2008-11-24 Packing Device Capped w/Cement 1965.00 1973.00 0
2008-11-24 Perforation 1102.50 1103.50 13
2008-11-25 Remedial Casing Cementing 1102.50 1103.50 0
2008-11-25 Perforation 559.50 560.50 13
2008-11-26 Remedial Casing Cementing 559.50 560.50 0
2008-11-27 Perforation 451.00 452.00 13
2008-11-27 Remedial Casing Cementing 451.00 452.00 0
1963-09-26 Acid Treatment 2241.20 2242.10 0
1964-03-01 Cement Squeeze 2241.20 2242.10 0
1964-03-04 Perforation 2240.90 2241.50 7
1964-03-04 Acid Wash 2240.90 2241.50 0
1964-03-04 Acid Treatment 2240.90 2241.50 0
1992-08-26 Packing Device Capped w/Cement 2227.00 2235.00 0
1992-08-26 Perforation 1980.60 1994.60 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 3960 0.0 0.0 0.0
1968 5056 0.0 0.0 0.0
1969 1790 0.0 0.0 0.0
1978 350 0.0 0.0 0.0
1979 770 0.0 0.0 0.0
1980 196 0.0 0.0 0.0
1981 173 0.0 0.0 0.0
1982 192 0.0 0.0 0.0
1984 7355 0.0 0.0 0.0
1985 3487 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0

For data sources see[5]

References