X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385032001000

Well Details

Well ID: 0385032001000
Loading map...
Location: 00/01-20-038-03W5/0
Location Alias: 00/01-20-38-03 W5M
Location Alias 2: 00/01-20-038-03 W5/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 03
Section: 20
County/Municipality: Lacombe County
Well Name: CVE SYLAKE 1-20-38-3
Operator Name: Cenovus Energy Inc.
License Number: 0142552
License Date: 1990-01-08
License Status: Suspension
Spud Date: 1990-01-20
Final Drill Date: 1990-02-03
Well Total Depth: 2294.00 m
Surface Hole Latitude: 52.277248
Surface Hole Longitude: -114.386072

For data sources see[1][2]

Well History

Date Event
1990-01-08 Obtained License
1990-01-21 Surface Casing Operation Performed
1990-02-03 Finished Drilling
1990-02-03 Well Log Performed
1990-02-03 Well Mode changed to Drilled and Cased
1990-02-04 Well Log Performed
1990-02-05 Drill Stem Test Performed
1990-02-07 Production Casing Operation Performed
1990-02-07 Rig Released
1990-03-07 Perforation Treatment Performed - Jet Perforation
1990-03-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-03-08 Perforation Treatment Performed - Cement Squeeze
1990-03-14 Perforation Treatment Performed - Jet Perforation
1990-03-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-03-25 Well Began Production
1990-03-25 Well Fluid changed to Crude Oil
1990-03-25 Well Mode changed to Flowing
1990-06-29 Well Fluid changed to Crude Oil
1990-06-29 Well Mode changed to Pumping
1998-06-01 Well Fluid changed to Crude Oil
1998-06-01 Well Mode changed to Suspended
2003-01-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-01-05 Plug Back Performed
2003-01-05 Well Fluid changed to Crude Oil
2003-01-05 Well Log Performed
2003-01-05 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-03-07 Perforation 2244.00 2245.00 13
1990-03-08 Acid Treatment 2244.00 2245.00 0
1990-03-08 Cement Squeeze 2244.00 2245.00 0
1990-03-14 Perforation 2237.00 2238.50 13
1990-03-14 Perforation 2242.00 2243.00 13
1990-03-15 Acid Treatment 2237.00 2243.00 0
2003-01-05 Packing Device Capped w/Cement 2228.00 2236.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 2118 0.0 0.0 0.0
1991 2154 0.0 0.0 0.0
1992 5345 0.0 0.0 0.0
1993 6637 0.0 0.0 0.0
1994 8165 0.0 0.0 0.0
1995 8675 0.0 0.0 0.0
1996 8304 0.0 0.0 0.0
1997 8507 0.0 0.0 0.0
1998 1977 0.0 0.0 0.0

For data sources see[5]

References