X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385030704000

Well Details

Well ID: 0385030704000
Loading map...
Location: 00/04-07-038-03W5/0
Location Alias: 00/04-07-38-03 W5M
Location Alias 2: 00/04-07-038-03 W5/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 03
Section: 07
County/Municipality: Red Deer County
Well Name: CVE SYLAKE 4-7-38-3
Operator Name: Cenovus Energy Inc.
License Number: 0026419
License Date: 1964-07-06
License Status: Abandoned
Spud Date: 1964-07-09
Final Drill Date: 1964-07-25
Well Total Depth: 2322.30 m
Surface Hole Latitude: 52.247710
Surface Hole Longitude: -114.427656

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-07-06 Obtained License
1964-07-25 Finished Drilling
1964-07-25 Well Mode changed to Drilled and Cased
1964-07-26 Drill Stem Test Performed
1964-07-27 Drill Stem Test Performed
1964-07-28 Drill Stem Test Performed
1964-07-29 Drill Stem Test Performed
1964-07-30 Production Casing Operation Performed
1964-08-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-08-19 Perforation Treatment Performed - Acid Wash - No Pressure
1964-08-19 Perforation Treatment Performed - Jet Perforation
1964-08-21 Well Began Production
1964-08-21 Well Fluid changed to Crude Oil
1964-08-21 Well Mode changed to Flowing
1967-02-16 Well Fluid changed to Crude Oil
1967-02-16 Well Mode changed to Suspended
1969-01-07 Well Fluid changed to Crude Oil
1969-01-07 Well Mode changed to Flowing
1969-01-22 Well Fluid changed to Crude Oil
1969-01-22 Well Mode changed to Suspended
1969-05-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1969-05-13 Perforation Treatment Performed - Jet Perforation
1969-05-13 Well Fluid changed to Crude Oil
1969-05-13 Well Mode changed to Abandoned Zone
1969-05-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-02-09 Perforation Treatment Performed - Cement Squeeze
1976-03-06 Perforation Treatment Performed - Acid Wash - No Pressure
1976-03-06 Perforation Treatment Performed - Cement Squeeze
1976-03-16 Perforation Treatment Performed - Jet Perforation
1976-03-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-11-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-11-25 Plug Back Performed
1995-11-25 Well Log Performed
1995-11-26 Perforation Treatment Performed - Jet Perforation
1995-11-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-12-01 Well Fluid changed to Crude Oil
1995-12-01 Well Mode changed to Pumping
1996-06-17 Well Fluid changed to Crude Oil
1996-06-17 Well Mode changed to Suspended
1996-06-18 Perforation Treatment Performed - Jet Perforation
1996-06-18 Well Log Performed
1996-06-19 Perforation Treatment Performed - Jet Perforation
1996-06-20 Perforation Treatment Performed - Cement Squeeze
1996-06-20 Well Fluid changed to Crude Oil
1996-06-20 Well Mode changed to Abandoned Zone
1996-06-23 Perforation Treatment Performed - Jet Perforation
1996-06-25 Perforation Treatment Performed - Fractured
1996-07-17 Well Log Performed
2014-07-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-07-04 Plug Back Performed
2014-07-05 Perforation Treatment Performed - Jet Perforation
2014-07-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-07-06 Perforation Treatment Performed - Jet Perforation
2014-07-06 Perforation Treatment Performed - Remedial Casing
2014-07-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-07-07 Perforation Treatment Performed - Jet Perforation
2014-07-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-07-23 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-08-19 Perforation 2234.80 2236.60 7
1976-03-16 Perforation 2272.00 2278.10 13
1976-03-18 Acid Treatment 2272.00 2278.10 0
1995-11-25 Packing Device Capped w/Cement 2240.00 2249.00 0
1995-11-26 Perforation 2226.50 2228.10 17
1995-11-26 Perforation 2230.00 2231.00 17
1995-11-26 Perforation 2232.40 2239.70 17
1995-11-26 Perforation 2240.60 2242.70 17
1995-11-27 Acid Treatment 2226.50 2242.70 0
1996-06-18 Perforation 2212.80 2215.50 18
1996-06-18 Perforation 2216.50 2218.50 18
1964-08-19 Acid Wash 2234.80 2236.60 0
1996-06-19 Perforation 2224.20 2225.20 18
1996-06-20 Cement Squeeze 2212.80 2215.50 0
1996-06-20 Cement Squeeze 2216.50 2218.50 0
1996-06-20 Cement Squeeze 2224.20 2225.20 0
1996-06-20 Cement Squeeze 2226.50 2228.10 0
1996-06-20 Cement Squeeze 2230.00 2231.00 0
1996-06-20 Cement Squeeze 2232.40 2239.70 0
1996-06-20 Cement Squeeze 2240.60 2242.70 0
1996-06-23 Perforation 2214.00 2216.00 18
1996-06-25 Fracture 2214.00 2216.00 0
1964-08-19 Acid Treatment 2234.80 2236.60 0
2014-07-04 Packing Device Capped w/Cement 2197.00 2205.00 0
2014-07-05 Perforation 1072.00 1073.00 13
2014-07-06 Remedial Casing Cementing 1072.00 1073.00 0
2014-07-06 Packing Device Capped w/Cement 1043.00 1067.00 0
2014-07-06 Perforation 569.00 570.00 13
2014-07-06 Remedial Casing Cementing 569.00 570.00 0
2014-07-06 Packing Device Capped w/Cement 548.00 564.00 0
2014-07-07 Perforation 445.00 446.00 13
2014-07-07 Packing Device Capped w/Cement 431.00 439.00 0
2014-07-07 Perforation 421.00 422.00 13
1969-05-13 Packing Device Capped w/Cement 2231.10 2231.10 0
2014-07-07 Packing Device Capped w/Cement 406.00 414.00 0
2014-07-07 Perforation 340.00 341.00 13
2014-07-07 Packing Device Capped w/Cement 327.00 335.00 0
2014-07-07 Perforation 300.00 301.00 13
2014-07-07 Packing Device Capped w/Cement 287.00 295.00 0
2014-07-07 Perforation 250.00 251.00 13
2014-07-08 Packing Device Capped w/Cement 237.00 245.00 0
1969-05-13 Perforation 2219.60 2221.40 7
1969-05-14 Acid Treatment 2219.60 2221.40 0
1976-02-09 Cement Squeeze 2219.60 2221.40 0
1976-03-06 Acid Wash 2234.80 2236.60 0
1976-03-06 Cement Squeeze 2234.80 2236.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1995 483 0.0 0.0 0.0
1996 2964 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-07-23 No Incident Encountered 0.00 0.00

For data sources see[6]

References