X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385030415000

Well Details

Well ID: 0385030415000
Loading map...
Location: 00/15-04-038-03W5/0
Location Alias: 00/15-04-38-03 W5M
Location Alias 2: 00/15-04-038-03 W5/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 03
Section: 04
County/Municipality: Red Deer County
Well Name: CVE SYLAKE 15-4-38-3
Operator Name: Cenovus Energy Inc.
License Number: 0160038
License Date: 1993-07-27
License Status: Suspension
Spud Date: 1993-07-31
Final Drill Date: 1993-08-10
Well Total Depth: 2272.00 m
Surface Hole Latitude: 52.245296
Surface Hole Longitude: -114.368685

For data sources see[1][2]

Well History

Date Event
1993-07-27 Obtained License
1993-08-02 Surface Casing Operation Performed
1993-08-10 Finished Drilling
1993-08-10 Well Log Performed
1993-08-10 Well Mode changed to Drilled and Cased
1993-08-12 Production Casing Operation Performed
1993-08-12 Rig Released
1993-08-19 Perforation Treatment Performed - Jet Perforation
1993-08-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-08-20 Perforation Treatment Performed - Cement Squeeze
1993-08-21 Well Log Performed
1993-08-22 Perforation Treatment Performed - Jet Perforation
1993-08-23 Perforation Treatment Performed - Acid Wash - No Pressure
1993-09-02 Well Began Production
1993-09-02 Well Fluid changed to Crude Oil
1993-09-02 Well Mode changed to Flowing
1993-09-11 Well Fluid changed to Crude Oil
1993-09-11 Well Mode changed to Pumping
1994-04-21 Perforation Treatment Performed - Cement Squeeze
1994-04-25 Well Log Performed
1994-04-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-04-26 Perforation Treatment Performed - Jet Perforation
1994-04-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-11-01 Well Log Performed
1995-11-02 Perforation Treatment Performed - Fractured
1995-11-02 Perforation Treatment Performed - Jet Perforation
1995-11-02 Well Log Performed
1995-11-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-10-01 Well Fluid changed to Crude Oil
1996-10-01 Well Mode changed to Suspended
1999-08-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-08-21 Perforation Treatment Performed - Jet Perforation
1999-08-21 Plug Back Performed
1999-08-21 Well Fluid changed to Crude Oil
1999-08-21 Well Log Performed
1999-08-21 Well Mode changed to Abandoned Zone
1999-08-22 Perforation Treatment Performed - Remedial Casing
1999-08-24 Perforation Treatment Performed - Jet Perforation
1999-08-24 Well Log Performed
1999-08-26 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-08-19 Perforation 2209.50 2210.50 18
1995-11-02 Perforation 2202.50 2205.50 18
1995-11-02 Fracture 2202.50 2205.50 0
1995-11-03 Acid Treatment 2202.50 2205.50 0
1999-08-21 Packing Device Capped w/Cement 2187.00 2195.00 0
1999-08-21 Perforation 536.00 537.00 13
1999-08-22 Remedial Casing Cementing 536.00 537.00 0
1999-08-24 Perforation 505.00 512.00 20
1999-08-26 Fracture 505.00 512.00 0
1993-08-20 Acid Treatment 2209.50 2210.50 0
1993-08-20 Cement Squeeze 2209.50 2210.50 0
1993-08-22 Perforation 2203.00 2207.00 18
1993-08-23 Acid Wash 2203.00 2207.00 0
1994-04-21 Cement Squeeze 2203.00 2207.00 0
1994-04-26 Perforation 2203.00 2204.00 18
1994-04-26 Acid Treatment 2203.00 2204.00 0
1994-04-27 Acid Treatment 2203.00 2204.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 2402 0.0 0.0 0.0
1994 6829 0.0 0.0 0.0
1995 576 0.0 0.0 0.0
1996 4374 0.0 0.0 0.0

For data sources see[5]

References