If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0385022007000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.280884,"lon":-114.2481,"icon":""}]} |
Location: 00/07-20-038-02W5/0 | |
Location Alias: 00/07-20-38-02 W5M | |
Location Alias 2: 00/07-20-038-02 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 038 | |
Meridian: 5 | |
Range: 02 | |
Section: 20 | |
County/Municipality: Red Deer County | |
Well Name: HARVEST SYLAKE 7-20-38-2 | |
Operator Name: Harvest Operations Corp. | |
License Number: 0024248 | |
License Date: 1963-06-04 | |
License Status: Suspension | |
Spud Date: 1963-06-04 | |
Final Drill Date: 1963-06-25 | |
Well Total Depth: 2187.20 m | |
Surface Hole Latitude: 52.280884 | |
Surface Hole Longitude: -114.248100 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1963-06-04 | Obtained License |
1963-06-23 | Drill Stem Test Performed |
1963-06-25 | Finished Drilling |
1963-06-25 | Well Mode changed to Drilled and Cased |
1963-06-27 | Drill Stem Test Performed |
1963-06-29 | Production Casing Operation Performed |
1963-09-11 | Perforation Treatment Performed - Jet Perforation |
1963-09-11 | Perforation Treatment Performed - Selective Jet Perforations |
1963-09-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1963-10-04 | Well Began Production |
1963-10-04 | Well Fluid changed to Crude Oil |
1963-10-04 | Well Mode changed to Flowing |
1964-06-02 | Well Fluid changed to Crude Oil |
1964-06-02 | Well Mode changed to Suspended |
1972-09-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-07-29 | Perforation Treatment Performed - Jet Perforation |
1994-07-29 | Perforation Treatment Performed - Selective Jet Perforations |
1994-08-01 | Well Fluid changed to Crude Oil |
1994-08-01 | Well Mode changed to Pumping |
1994-08-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1995-11-21 | Perforation Treatment Performed - Jet Perforation |
1995-11-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2016-12-01 | Well Fluid changed to Crude Oil |
2016-12-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1963-09-11 | Selective Jet Perforations | 2153.40 | 2154.30 | 0 |
1963-09-11 | Perforation | 2152.20 | 2152.50 | 3 |
1963-09-11 | Perforation | 2148.80 | 2150.10 | 3 |
1963-09-11 | Selective Jet Perforations | 2143.40 | 2144.30 | 0 |
1963-09-11 | Selective Jet Perforations | 2145.20 | 2146.10 | 0 |
1963-09-11 | Selective Jet Perforations | 2147.00 | 2147.90 | 0 |
1963-09-11 | Perforation | 2139.10 | 2140.60 | 3 |
1963-09-13 | Acid Treatment | 2139.10 | 2168.00 | 0 |
1972-09-14 | Packing Device Capped w/Cement | 2120.50 | 2132.10 | 0 |
1994-07-29 | Perforation | 2139.10 | 2140.60 | 3 |
1994-07-29 | Selective Jet Perforations | 2143.40 | 2144.00 | 0 |
1963-09-11 | Selective Jet Perforations | 2155.20 | 2156.20 | 0 |
1994-07-29 | Selective Jet Perforations | 2145.20 | 2147.90 | 0 |
1994-07-29 | Selective Jet Perforations | 2153.40 | 2156.20 | 0 |
1994-07-29 | Selective Jet Perforations | 2157.10 | 2159.80 | 0 |
1994-07-29 | Selective Jet Perforations | 2160.70 | 2168.00 | 0 |
1994-08-14 | Acid Treatment | 2139.10 | 2168.00 | 0 |
1995-11-21 | Perforation | 2143.00 | 2146.90 | 13 |
1995-11-21 | Perforation | 2157.90 | 2161.50 | 13 |
1995-11-21 | Perforation | 2164.60 | 2167.00 | 13 |
1995-11-22 | Acid Treatment | 2143.00 | 2167.00 | 0 |
1963-09-11 | Selective Jet Perforations | 2157.10 | 2158.00 | 0 |
1963-09-11 | Selective Jet Perforations | 2158.90 | 2159.80 | 0 |
1963-09-11 | Selective Jet Perforations | 2160.70 | 2161.60 | 0 |
1963-09-11 | Selective Jet Perforations | 2162.60 | 2163.50 | 0 |
1963-09-11 | Selective Jet Perforations | 2164.40 | 2165.30 | 0 |
1963-09-11 | Selective Jet Perforations | 2166.20 | 2167.10 | 0 |
1963-09-11 | Selective Jet Perforations | 2168.00 | 2168.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1963 | 0 | 0.0 | 0.0 | 0.0 |
1994 | 2648 | 0.0 | 0.0 | 0.0 |
1995 | 7641 | 0.0 | 0.0 | 0.0 |
1996 | 7568 | 0.0 | 0.0 | 0.0 |
1997 | 7806 | 0.0 | 0.0 | 0.0 |
1998 | 8612 | 0.0 | 0.0 | 0.0 |
1999 | 6519 | 0.0 | 0.0 | 0.0 |
2000 | 8293 | 0.0 | 0.0 | 0.0 |
2001 | 8723 | 0.0 | 0.0 | 0.0 |
2002 | 8755 | 0.0 | 0.0 | 0.0 |
2003 | 8058 | 0.0 | 0.0 | 0.0 |
2004 | 8400 | 0.0 | 0.0 | 0.0 |
2005 | 8628 | 0.0 | 0.0 | 0.0 |
2006 | 8593 | 0.0 | 0.0 | 0.0 |
2007 | 8687 | 0.0 | 0.0 | 0.0 |
2008 | 8378 | 0.0 | 0.0 | 0.0 |
2009 | 8494 | 0.0 | 0.0 | 0.0 |
2010 | 8367 | 0.0 | 0.0 | 0.0 |
2011 | 8266 | 0.0 | 0.0 | 0.0 |
2012 | 7612 | 0.0 | 0.0 | 0.0 |
2013 | 7982 | 0.0 | 0.0 | 0.0 |
2014 | 8144 | 0.0 | 0.0 | 0.0 |
2015 | 8399 | 0.0 | 0.0 | 0.0 |
2016 | 6239 | 0.0 | 0.0 | 0.0 |
For data sources see[5]