X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385022003020

Well Details

Well ID: 0385022003020
Loading map...
Location: 02/03-20-038-02W5/0
Location Alias: 02/03-20-38-02 W5M
Location Alias 2: 02/03-20-038-02 W5/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 02
Section: 20
County/Municipality: Red Deer County
Well Name: HARVEST SYLAKE 3-20-38-2
Operator Name: Harvest Operations Corp.
License Number: 0318242
License Date: 2004-11-03
License Status: Suspension
Spud Date: 2004-11-29
Final Drill Date: 2004-12-05
Well Total Depth: 2268.00 m
Surface Hole Latitude: 52.277745
Surface Hole Longitude: -114.258306

For data sources see[1][2]

Well History

Date Event
2004-11-03 Obtained License
2004-11-30 Surface Casing Operation Performed
2004-12-03 Direction Drilling Operation Performed - Deviate
2004-12-05 Finished Drilling
2004-12-05 Well Mode changed to Drilled and Cased
2004-12-06 Production Casing Operation Performed
2004-12-06 Well Began Production
2004-12-06 Well Fluid changed to Crude Oil
2004-12-06 Well Mode changed to Pumping
2004-12-07 Rig Released
2004-12-09 Perforation Treatment Performed - Jet Perforation
2004-12-09 Well Log Performed
2004-12-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-08-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-08-05 Perforation Treatment Performed - Jet Perforation
2011-08-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-08-06 Well Log Performed
2016-12-01 Well Fluid changed to Crude Oil
2016-12-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2004-12-03 1445.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-12-09 Perforation 2199.00 2210.00 17
2004-12-10 Acid Treatment 2199.00 2210.00 0
2011-08-04 Acid Treatment 2199.00 2210.00 0
2011-08-05 Perforation 2191.50 2198.00 17
2011-08-05 Perforation 2183.50 2184.50 17
2011-08-05 Perforation 2187.00 2190.50 17
2011-08-06 Acid Treatment 2183.50 2198.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 696 0.0 0.0 0.0
2005 7966 0.0 0.0 0.0
2006 6456 0.0 0.0 0.0
2007 8134 0.0 0.0 0.0
2008 7635 0.0 0.0 0.0
2009 8469 0.0 0.0 0.0
2010 7660 0.0 0.0 0.0
2011 4045 0.0 0.0 0.0
2012 7721 0.0 0.0 0.0
2013 6771 0.0 0.0 0.0
2014 7689 0.0 0.0 0.0
2015 8404 0.0 0.0 0.0
2016 5965 0.0 0.0 0.0

For data sources see[6]

References