X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385021712000

Well Details

Well ID: 0385021712000
Loading map...
Location: 00/12-17-038-02W5/0
Location Alias: 00/12-17-38-02 W5M
Location Alias 2: 00/12-17-038-02 W5/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 02
Section: 17
County/Municipality: Red Deer County
Well Name: HARVEST SYLAKE 12-17-38-2
Operator Name: Harvest Operations Corp.
License Number: 0241196
License Date: 2000-08-21
License Status: Abandoned
Spud Date: 2000-10-04
Final Drill Date: 2000-10-09
Well Total Depth: 2180.00 m
Surface Hole Latitude: 52.270594
Surface Hole Longitude: -114.258157

For data sources see[1][2]

Well History

Date Event
2000-08-21 Obtained License
2000-10-05 Surface Casing Operation Performed
2000-10-09 Finished Drilling
2000-10-10 Well Log Performed
2000-10-11 Drill Stem Test Performed
2000-10-12 Production Casing Operation Performed
2000-10-13 Rig Released
2000-10-13 Well Mode changed to Drilled and Cased
2000-10-17 Perforation Treatment Performed - Jet Perforation
2000-10-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-10-30 Well Began Production
2000-10-30 Well Fluid changed to Crude Oil
2000-10-30 Well Mode changed to Pumping
2002-05-30 Perforation Treatment Performed - Cement Squeeze
2002-06-02 Perforation Treatment Performed - Jet Perforation
2002-06-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-01-01 Well Fluid changed to Crude Oil
2004-01-01 Well Mode changed to Suspended
2004-10-13 Well Log Performed
2004-10-14 Well Log Performed
2004-11-01 Well Began Injection
2004-11-01 Well Fluid changed to Water
2004-11-01 Well Type changed to Injection
2016-12-01 Well Fluid changed to Water
2016-12-01 Well Mode changed to Suspended
2016-12-01 Well Type changed to Injection
2019-05-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-05-26 Plug Back Performed
2019-05-26 Well Fluid changed to Water
2019-05-26 Well Mode changed to Abandoned Zone
2019-05-26 Well Type changed to Injection
2019-09-04 Well Abandoned
2019-09-04 Well Fluid changed to Water
2019-09-04 Well Mode changed to Abandoned
2019-09-04 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-10-17 Perforation 2109.00 2111.00 14
2000-10-19 Acid Treatment 2137.00 2152.00 0
2002-05-30 Cement Squeeze 2109.00 2111.00 0
2002-05-30 Cement Squeeze 2112.50 2114.50 0
2002-05-30 Cement Squeeze 2116.00 2118.00 0
2002-06-02 Perforation 2123.00 2135.00 14
2002-06-02 Perforation 2137.00 2152.00 14
2002-06-04 Acid Treatment 2137.00 2152.00 0
2002-06-04 Acid Treatment 2133.00 2135.00 0
2019-05-26 Packing Device Capped w/Cement 2089.80 2097.80 0
2000-10-17 Perforation 2112.50 2114.50 14
2000-10-17 Perforation 2116.00 2118.00 14
2000-10-17 Perforation 2120.00 2135.00 14
2000-10-17 Perforation 2137.00 2152.00 14
2000-10-19 Acid Treatment 2109.00 2111.00 0
2000-10-19 Acid Treatment 2112.50 2114.50 0
2000-10-19 Acid Treatment 2116.00 2118.00 0
2000-10-19 Acid Treatment 2120.00 2135.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 1248 0.0 0.0 0.0
2001 4789 0.0 0.0 0.0
2002 2185 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-05-26 No Incident Encountered 0.00 0.00

For data sources see[6]

References