X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385021510000

Well Details

Well ID: 0385021510000
Loading map...
Location: 00/10-15-038-02W5/0
Location Alias: 00/10-15-38-02 W5M
Location Alias 2: 00/10-15-038-02 W5/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 02
Section: 15
County/Municipality: Red Deer County
Well Name: HARVEST SYLAKE 10-15-38-2
Operator Name: Harvest Operations Corp.
License Number: 0023597
License Date: 1963-01-03
License Status: Suspension
Spud Date: 1963-01-11
Final Drill Date: 1963-02-02
Well Total Depth: 2219.90 m
Surface Hole Latitude: 52.270059
Surface Hole Longitude: -114.201168

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-01-03 Obtained License
1963-01-24 Drill Stem Test Performed
1963-01-28 Drill Stem Test Performed
1963-01-31 Drill Stem Test Performed
1963-02-02 Finished Drilling
1963-02-02 Well Mode changed to Drilled and Cased
1963-02-04 Production Casing Operation Performed
1963-02-10 Perforation Treatment Performed - Jet Perforation
1963-02-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-03-07 Well Began Production
1963-03-07 Well Fluid changed to Crude Oil
1963-03-07 Well Mode changed to Flowing
1964-01-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-01-15 Perforation Treatment Performed - Fractured
1964-10-02 Well Fluid changed to Crude Oil
1964-10-02 Well Mode changed to Suspended
1967-08-25 Well Fluid changed to Crude Oil
1967-08-25 Well Mode changed to Flowing
1968-10-11 Well Fluid changed to Crude Oil
1968-10-11 Well Mode changed to Suspended
1969-09-01 Well Fluid changed to Crude Oil
1969-09-01 Well Mode changed to Flowing
1972-11-01 Well Fluid changed to Crude Oil
1972-11-01 Well Mode changed to Suspended
1993-11-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-11-12 Well Fluid changed to Crude Oil
1993-11-12 Well Mode changed to Pumping
1996-02-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-02-25 Perforation Treatment Performed - Jet Perforation
2002-08-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-06-01 Well Fluid changed to Crude Oil
2012-06-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-02-10 Perforation 2153.70 2156.20 13
2002-08-26 Acid Treatment 2153.70 2156.20 0
1963-02-11 Acid Treatment 2153.70 2156.20 0
1964-01-15 Fracture 2153.70 2156.20 0
1964-01-15 Acid Treatment 2153.70 2156.20 0
1993-11-06 Acid Treatment 2153.70 2156.20 0
1996-02-25 Perforation 2142.40 2144.00 13
1996-02-25 Perforation 2147.60 2153.10 13
1996-02-25 Acid Treatment 2142.40 2156.20 0
2002-08-26 Acid Treatment 2147.60 2153.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 593 0.0 0.0 0.0
1970 3108 0.0 0.0 0.0
1971 517 0.0 0.0 0.0
1993 1239 0.0 0.0 0.0
1994 5807 0.0 0.0 0.0
1995 8027 0.0 0.0 0.0
1996 5377 0.0 0.0 0.0
1997 7501 0.0 0.0 0.0
1998 8451 0.0 0.0 0.0
1999 8542 0.0 0.0 0.0
2000 7739 0.0 0.0 0.0
2001 4182 0.0 0.0 0.0
2002 8083 0.0 0.0 0.0
2003 5343 0.0 0.0 0.0
2004 7601 0.0 0.0 0.0
2005 7245 0.0 0.0 0.0
2006 1192 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-09-12 No Incident Encountered 0.00 0.00

For data sources see[6]

References