X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385020606002

Well Details

Well ID: 0385020606002
Loading map...
Location: 00/06-06-038-02W5/2
Location Alias: 00/06-06-38-02 W5M
Location Alias 2: 00/06-06-038-02 W5/02
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 02
Section: 06
County/Municipality: Red Deer County
Well Name: CNGL SYLAKE 6-6-38-2
Operator Name: Harvest Operations Corp.
License Number: 0056575
License Date: 1976-01-13
License Status: Issued
Spud Date: 1976-01-16
Final Drill Date: 1976-01-29
Well Total Depth: 2185.40 m
Surface Hole Latitude: 52.236337
Surface Hole Longitude: -114.279140

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-01-13 Obtained License
1976-01-29 Finished Drilling
1976-01-29 Well Mode changed to Drilled and Cased
1976-01-30 Drill Stem Test Performed
1976-01-31 Drill Stem Test Performed
1976-02-02 Production Casing Operation Performed
1976-06-04 Perforation Treatment Performed - Jet Perforation
1976-06-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-06-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-06-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-06-12 Perforation Treatment Performed - Jet Perforation
1976-06-19 Perforation Treatment Performed - Fractured
1976-08-27 Perforation Treatment Performed - Jet Perforation
1976-08-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-08-31 Perforation Treatment Performed - Cement Squeeze
1976-09-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-09-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-09-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-09-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-09-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-09-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-09-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-01-14 Perforation Treatment Performed - Jet Perforation
2000-01-16 Well Log Performed
2000-01-17 Perforation Treatment Performed - Jet Perforation
2000-01-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-01-25 Well Log Performed
2000-01-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-01-26 Well Log Performed
2000-01-27 Perforation Treatment Performed - Jet Perforation
2000-01-31 Perforation Treatment Performed - Fractured
2000-03-20 Well Began Production
2000-03-20 Well Fluid changed to Gas
2000-03-20 Well Mode changed to Flowing
2016-10-01 Well Fluid changed to Gas
2016-10-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-06-04 Perforation 2104.90 2107.10 7
1976-08-31 Cement Squeeze 2094.30 2094.30 0
1976-09-02 Acid Treatment 2084.20 2087.90 0
1976-09-10 Acid Treatment 2084.20 2087.90 0
1976-09-16 Acid Treatment 2104.90 2107.10 0
1976-09-21 Acid Treatment 2104.90 2107.10 0
1976-09-23 Acid Treatment 2104.90 2107.10 0
1976-09-29 Acid Treatment 2084.20 2087.90 0
1976-09-30 Packing Device Capped w/Cement 2097.90 2102.50 0
2000-01-14 Perforation 2104.90 2107.10 7
2000-01-17 Perforation 2141.50 2142.70 17
1976-06-07 Acid Treatment 2104.90 2107.10 0
2000-01-17 Perforation 2147.00 2148.20 17
2000-01-17 Perforation 2152.50 2153.70 17
2000-01-17 Perforation 2162.30 2165.90 17
2000-01-19 Acid Treatment 2141.50 2165.90 0
2000-01-26 Packing Device Capped w/Cement 2130.00 2138.00 0
2000-01-26 Packing Device Capped w/Cement 2092.00 2100.00 0
2000-01-27 Perforation 1923.90 1926.90 17
2000-01-31 Fracture 1923.90 1926.90 0
1976-06-08 Acid Treatment 2104.90 2107.10 0
1976-06-12 Perforation 2084.20 2085.70 13
1976-06-12 Perforation 2087.00 2087.90 13
1976-06-12 Acid Treatment 2084.20 2087.90 0
1976-06-19 Fracture 2084.20 2087.90 0
1976-08-27 Perforation 2094.30 2094.30 13
1976-08-30 Acid Treatment 2094.30 2094.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 6822 0.0 0.0 0.0
2001 8584 0.0 0.0 0.0
2002 8750 0.0 0.0 0.0
2003 8703 0.0 0.0 0.0
2004 8702 0.0 0.0 0.0
2005 8670 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8740 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8478 0.0 0.0 0.0
2012 8699 0.0 0.0 0.0
2013 8700 0.0 0.0 0.0
2014 8677 0.0 0.0 0.0
2015 8722 0.0 0.0 0.0
2016 8735 0.0 0.0 0.0
2017 8488 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8756 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References