X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385013514000

Well Details

Well ID: 0385013514000
Loading map...
Location: 00/14-35-038-01W5/0
Location Alias: 00/14-35-38-01 W5M
Location Alias 2: 00/14-35-038-01 W5/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 01
Section: 35
County/Municipality: Sylvan Lake
Well Name: GNE CUPID PREVO 14-35-38-1
Operator Name: Rimbey Hydrocarbons Inc.
License Number: 0113619
License Date: 1985-02-26
License Status: RecCertified
Spud Date: 1985-02-26
Final Drill Date: 1985-03-04
Well Total Depth: 1790.00 m
Surface Hole Latitude: 52.318737
Surface Hole Longitude: -114.038424

For data sources see[1][2]

Well History

Date Event
1985-02-26 Obtained License
1985-02-27 Surface Casing Operation Performed
1985-03-04 Finished Drilling
1985-03-04 Well Log Performed
1985-03-04 Well Mode changed to Drilled and Cased
1985-03-05 Production Casing Operation Performed
1985-03-05 Rig Released
1985-03-12 Well Log Performed
1985-03-15 Perforation Treatment Performed - Jet Perforation
1985-03-15 Well Log Performed
1985-03-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-03-17 Perforation Treatment Performed - Jet Perforation
1985-03-17 Well Log Performed
1985-03-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-03-19 Perforation Treatment Performed - Fractured
1985-03-24 Well Log Performed
1985-04-01 Well Began Production
1985-04-01 Well Fluid changed to Crude Oil
1985-04-01 Well Mode changed to Flowing
1988-09-09 Well Fluid changed to Crude Oil
1988-09-09 Well Mode changed to Pumping
1989-10-31 Well Fluid changed to Crude Oil
1989-10-31 Well Mode changed to Suspended
1990-12-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-12-21 Plug Back Performed
1990-12-21 Well Fluid changed to Crude Oil
1990-12-21 Well Mode changed to Abandoned
1990-12-22 Perforation Treatment Performed - Cement Plug
1990-12-22 Plug Back Performed
1991-01-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-01-17 Plug Back Performed
1991-04-26 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-03-15 Perforation 1753.50 1755.00 14
1985-03-16 Acid Treatment 1753.50 1755.00 0
1985-03-17 Perforation 1749.00 1751.00 13
1985-03-18 Acid Treatment 1749.00 1751.00 0
1985-03-19 Fracture 1749.00 1751.00 0
1990-12-21 Packing Device Capped w/Cement 1234.00 1234.00 0
1990-12-22 Cement Plug 207.50 381.00 0
1991-01-17 Packing Device Capped w/Cement 152.00 160.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 5310 0.0 0.0 0.0
1986 6537 0.0 0.0 0.0
1987 8644 0.0 0.0 0.0
1988 8745 0.0 0.0 0.0
1989 6287 0.0 0.0 0.0
1990 41 0.0 0.0 0.0

For data sources see[5]

References