X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385013007000

Well Details

Well ID: 0385013007000
Loading map...
Location: 00/07-30-038-01W5/0
Location Alias: 00/07-30-38-01 W5M
Location Alias 2: 00/07-30-038-01 W5/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 01
Section: 30
County/Municipality: Sylvan Lake
Well Name: PROPHET ET AL SYLAKE 7-30-38-1
Operator Name: Prophet Petroleums Ltd.
License Number: 0104668
License Date: 1983-12-13
License Status: RecCertified
Spud Date: 1983-12-15
Final Drill Date: 1983-12-27
Well Total Depth: 2145.00 m
Surface Hole Latitude: 52.295809
Surface Hole Longitude: -114.131980

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-12-13 Obtained License
1983-12-16 Lost Circulation Occurred
1983-12-27 Finished Drilling
1983-12-27 Well Mode changed to Drilled and Cased
1983-12-28 Drill Stem Test Performed
1983-12-30 Production Casing Operation Performed
1983-12-30 Surface Casing Operation Performed
1984-01-05 Perforation Treatment Performed - Jet Perforation
1984-01-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-01-10 Perforation Treatment Performed - Fractured
1984-02-09 Well Began Production
1984-02-09 Well Fluid changed to Crude Oil
1984-02-09 Well Mode changed to Pumping
1984-12-27 Well Log Performed
1984-12-28 Perforation Treatment Performed - Jet Perforation
1984-12-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-01-04 Perforation Treatment Performed - Cement Squeeze
1985-01-04 Plug Back Performed
1985-01-25 Well Log Performed
1985-01-26 Perforation Treatment Performed - Jet Perforation
1985-02-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-10-01 Perforation Treatment Performed - Jet Perforation
1987-10-02 Perforation Treatment Performed - Fractured
1988-12-01 Well Fluid changed to Crude Oil
1988-12-01 Well Mode changed to Suspended
1989-12-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-12-01 Plug Back Performed
1989-12-01 Well Abandoned
1989-12-01 Well Fluid changed to Crude Oil
1989-12-01 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-01-05 Perforation 2052.00 2055.00 13
1985-02-20 Acid Treatment 2052.00 2055.00 0
1987-10-01 Perforation 2039.00 2041.00 13
1987-10-02 Fracture 2039.00 2055.00 0
1989-12-01 Packing Device Capped w/Cement 2027.00 2035.00 0
1984-01-06 Acid Treatment 2052.00 2055.00 0
1984-01-10 Fracture 2052.00 2055.00 0
1984-12-28 Perforation 1828.50 1830.00 13
1984-12-28 Perforation 1833.00 1836.50 13
1984-12-28 Perforation 1841.50 1846.00 13
1984-12-31 Acid Treatment 1828.50 1846.00 0
1985-01-04 Cement Squeeze 1828.50 1846.00 0
1985-01-26 Perforation 2052.00 2055.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 5528 0.0 0.0 0.0
1985 6170 0.0 0.0 0.0
1986 7872 0.0 0.0 0.0
1987 7297 0.0 0.0 0.0
1988 6828 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1983-12-16 Lost Circulation 101.00 101.00

For data sources see[6]

References