X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384281412002

Well Details

Well ID: 0384281412002
Loading map...
Location: 00/12-14-038-28W4/2
Location Alias: 00/12-14-38-28 W4M
Location Alias 2: 00/12-14-038-28 W4/02
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 28
Section: 14
County/Municipality: Red Deer County
Well Name: ANSCHUTZ ET AL CYGNET 12-14-38-28
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0081499
License Date: 1980-03-04
License Status: RecCertified
Spud Date: 1980-03-21
Final Drill Date: 1980-04-05
Well Total Depth: 1937.00 m
Surface Hole Latitude: 52.269377
Surface Hole Longitude: -113.903330

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-03-04 Obtained License
1980-03-29 Drill Stem Test Performed
1980-04-05 Finished Drilling
1980-04-05 Well Mode changed to Drilled and Cased
1980-04-06 Well Log Performed
1980-04-07 Production Casing Operation Performed
1980-05-02 Perforation Treatment Performed - Jet Perforation
1980-05-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-05-07 Perforation Treatment Performed - Jet Perforation
1980-05-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-05-09 Perforation Treatment Performed - Fractured
1985-01-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-01-10 Perforation Treatment Performed - Jet Perforation
1985-01-10 Plug Back Performed
1985-01-27 Perforation Treatment Performed - Fractured
1985-01-28 Perforation Treatment Performed - Fractured
1985-10-29 Well Began Production
1985-10-29 Well Fluid changed to Crude Oil
1985-10-29 Well Mode changed to Flowing
1986-11-01 Well Fluid changed to Crude Oil
1986-11-01 Well Mode changed to Suspended
1990-07-01 Well Fluid changed to Crude Oil
1990-07-01 Well Mode changed to Flowing
1993-09-01 Well Fluid changed to Crude Oil
1993-09-01 Well Mode changed to Suspended
1995-09-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-09-13 Plug Back Performed
1995-09-13 Well Fluid changed to Crude Oil
1995-09-13 Well Log Performed
1995-09-13 Well Mode changed to Abandoned
1995-09-14 Perforation Treatment Performed - Jet Perforation
1995-09-14 Perforation Treatment Performed - Remedial Casing
1995-09-14 Well Log Performed
1995-09-15 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-05-02 Perforation 1874.00 1876.00 13
1995-09-13 Packing Device Capped w/Cement 1657.00 1665.00 0
1995-09-14 Perforation 261.00 262.00 14
1995-09-14 Remedial Casing Cementing 261.00 262.00 0
1980-05-06 Packing Device Capped w/Cement 1862.00 1870.00 0
1980-05-07 Perforation 1831.00 1833.00 13
1980-05-08 Acid Treatment 1831.00 1833.00 0
1980-05-09 Fracture 1831.00 1833.00 0
1985-01-10 Packing Device Capped w/Cement 1777.00 1785.00 0
1985-01-10 Perforation 1668.00 1671.00 13
1985-01-27 Fracture 1668.00 1671.00 0
1985-01-28 Fracture 1668.00 1671.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 1477 0.0 0.0 0.0
1986 2285 0.0 0.0 0.0
1990 3696 0.0 0.0 0.0
1991 6862 0.0 0.0 0.0
1992 4790 0.0 0.0 0.0
1993 1 0.0 0.0 0.0

For data sources see[5]

References