If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0384261604020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.262518,"lon":-113.665944,"icon":""}]} |
Location: 02/04-16-038-26W4/0 | |
Location Alias: 02/04-16-38-26 W4M | |
Location Alias 2: 02/04-16-038-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 038 | |
Meridian: 4 | |
Range: 26 | |
Section: 16 | |
County/Municipality: Red Deer County | |
Well Name: SRI ERL 102 JOFFRE 4-16-38-26 | |
Operator Name: Gain Energy Ltd. | |
License Number: 0169762 | |
License Date: 1994-08-22 | |
License Status: Re-Entered | |
Spud Date: 1994-12-14 | |
Final Drill Date: 1994-12-21 | |
Well Total Depth: 1946.00 m | |
Surface Hole Latitude: 52.262518 | |
Surface Hole Longitude: -113.665944 |
Date | Event |
---|---|
1994-08-22 | Obtained License |
1994-12-15 | Surface Casing Operation Performed |
1994-12-21 | Drill Stem Test Performed |
1994-12-21 | Finished Drilling |
1994-12-21 | Well Log Performed |
1994-12-21 | Well Mode changed to Drilled and Cased |
1994-12-23 | Production Casing Operation Performed |
1994-12-23 | Rig Released |
1995-03-03 | Well Log Performed |
1995-03-04 | Perforation Treatment Performed - Jet Perforation |
1995-03-04 | Well Log Performed |
1995-03-06 | Perforation Treatment Performed - Fractured |
1995-05-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1995-05-13 | Plug Back Performed |
1995-05-24 | Perforation Treatment Performed - Jet Perforation |
1995-05-25 | Perforation Treatment Performed - Fractured |
1995-12-22 | Well Began Production |
1995-12-22 | Well Fluid changed to Crude Oil |
1995-12-22 | Well Mode changed to Flowing |
1996-06-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-06-19 | Plug Back Performed |
1996-06-19 | Well Abandoned |
1996-06-19 | Well Fluid changed to Crude Oil |
1996-06-19 | Well Mode changed to Abandoned and Re-entered |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1995-03-04 | Perforation | 1868.00 | 1872.00 | 13 |
1995-03-06 | Fracture | 1868.00 | 1872.00 | 0 |
1995-05-13 | Packing Device Capped w/Cement | 1857.00 | 1865.00 | 0 |
1995-05-24 | Perforation | 1844.00 | 1848.00 | 14 |
1995-05-25 | Fracture | 1844.00 | 1848.00 | 0 |
1996-06-19 | Packing Device Capped w/Cement | 1822.00 | 1830.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1995 | 204 | 0.0 | 0.0 | 0.0 |
1996 | 1910 | 0.0 | 0.0 | 0.0 |
For data sources see[5]