If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0384253408002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.309971,"lon":-113.483705,"icon":""}]} |
Location: 00/08-34-038-25W4/2 | |
Location Alias: 00/08-34-38-25 W4M | |
Location Alias 2: 00/08-34-038-25 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 038 | |
Meridian: 4 | |
Range: 25 | |
Section: 34 | |
County/Municipality: Lacombe County | |
Well Name: CPC RESOURCES JOFFRE 8-34-38-25 | |
Operator Name: Lynx Energy ULC | |
License Number: 0349431 | |
License Date: 2006-01-19 | |
License Status: Issued | |
Spud Date: 2006-01-30 | |
Final Drill Date: 2006-01-31 | |
Well Total Depth: 948.00 m | |
Surface Hole Latitude: 52.309971 | |
Surface Hole Longitude: -113.483705 |
Date | Event |
---|---|
2006-01-19 | Obtained License |
2006-01-30 | Surface Casing Operation Performed |
2006-01-31 | Finished Drilling |
2006-01-31 | Production Casing Operation Performed |
2006-01-31 | Rig Released |
2006-01-31 | Well Mode changed to Drilled and Cased |
2006-02-16 | Well Log Performed |
2006-02-27 | Perforation Treatment Performed - Jet Perforation |
2006-03-11 | Perforation Treatment Performed - Jet Perforation |
2006-03-20 | Perforation Treatment Performed - Fractured |
2006-03-27 | Well Began Production |
2006-03-27 | Well Fluid changed to Coalbed Methane-Coals and Other |
2006-03-27 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-02-27 | Perforation | 890.40 | 891.40 | 13 |
2006-03-11 | Perforation | 546.00 | 546.50 | 13 |
2006-03-11 | Perforation | 539.20 | 539.70 | 13 |
2006-03-11 | Perforation | 538.20 | 538.70 | 13 |
2006-03-11 | Perforation | 533.50 | 535.50 | 13 |
2006-03-11 | Perforation | 532.00 | 532.50 | 13 |
2006-03-11 | Perforation | 517.00 | 517.50 | 13 |
2006-03-11 | Perforation | 513.30 | 513.80 | 13 |
2006-03-11 | Perforation | 508.10 | 508.60 | 13 |
2006-03-11 | Perforation | 501.30 | 501.80 | 13 |
2006-03-11 | Perforation | 480.50 | 481.00 | 13 |
2006-02-27 | Perforation | 895.00 | 896.00 | 13 |
2006-03-11 | Perforation | 479.40 | 479.90 | 13 |
2006-03-11 | Perforation | 475.50 | 476.00 | 13 |
2006-03-11 | Perforation | 469.00 | 470.00 | 13 |
2006-03-11 | Perforation | 459.00 | 459.50 | 13 |
2006-03-11 | Perforation | 454.30 | 454.80 | 13 |
2006-03-11 | Perforation | 417.50 | 418.50 | 13 |
2006-03-11 | Perforation | 391.70 | 392.20 | 13 |
2006-03-11 | Perforation | 366.00 | 367.00 | 13 |
2006-03-11 | Perforation | 332.20 | 332.70 | 13 |
2006-03-11 | Perforation | 239.10 | 239.60 | 13 |
2006-03-11 | Perforation | 642.00 | 643.00 | 13 |
2006-03-11 | Perforation | 227.50 | 228.50 | 13 |
2006-03-11 | Perforation | 225.50 | 226.60 | 13 |
2006-03-11 | Perforation | 211.00 | 213.00 | 13 |
2006-03-11 | Perforation | 208.00 | 210.00 | 13 |
2006-03-20 | Fracture | 208.00 | 643.00 | 0 |
2006-03-11 | Perforation | 592.00 | 592.50 | 13 |
2006-03-11 | Perforation | 586.90 | 587.50 | 13 |
2006-03-11 | Perforation | 579.70 | 580.20 | 13 |
2006-03-11 | Perforation | 581.20 | 581.70 | 13 |
2006-03-11 | Perforation | 582.60 | 583.10 | 13 |
2006-03-11 | Perforation | 571.90 | 572.40 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 6707 | 0.0 | 0.0 | 0.0 |
2007 | 8759 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8669 | 0.0 | 0.0 | 0.0 |
2010 | 8698 | 0.0 | 0.0 | 0.0 |
2011 | 8628 | 0.0 | 0.0 | 0.0 |
2012 | 8726 | 0.0 | 0.0 | 0.0 |
2013 | 8713 | 0.0 | 0.0 | 0.0 |
2014 | 8749 | 0.0 | 0.0 | 0.0 |
2015 | 8755 | 0.0 | 0.0 | 0.0 |
2016 | 8759 | 0.0 | 0.0 | 0.0 |
2017 | 8733 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8711 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]