X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384253408000

Well Details

Well ID: 0384253408000
Loading map...
Location: 00/08-34-038-25W4/0
Location Alias: 00/08-34-38-25 W4M
Location Alias 2: 00/08-34-038-25 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 25
Section: 34
County/Municipality: Lacombe County
Well Name: CPC RESOURCES JOFFRE 8-34-38-25
Operator Name: Lynx Energy ULC
License Number: 0349431
License Date: 2006-01-19
License Status: Issued
Spud Date: 2006-01-30
Final Drill Date: 2006-01-31
Well Total Depth: 948.00 m
Surface Hole Latitude: 52.309971
Surface Hole Longitude: -113.483705

For data sources see[1][2]

Well History

Date Event
2006-01-19 Obtained License
2006-01-30 Surface Casing Operation Performed
2006-01-31 Finished Drilling
2006-01-31 Production Casing Operation Performed
2006-01-31 Rig Released
2006-01-31 Well Mode changed to Drilled and Cased
2006-02-16 Well Log Performed
2006-02-27 Perforation Treatment Performed - Jet Perforation
2006-03-11 Perforation Treatment Performed - Jet Perforation
2006-03-20 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-02-27 Perforation 890.40 891.40 13
2006-03-11 Perforation 546.00 546.50 13
2006-03-11 Perforation 539.20 539.70 13
2006-03-11 Perforation 538.20 538.70 13
2006-03-11 Perforation 533.50 535.50 13
2006-03-11 Perforation 532.00 532.50 13
2006-03-11 Perforation 517.00 517.50 13
2006-03-11 Perforation 513.30 513.80 13
2006-03-11 Perforation 508.10 508.60 13
2006-03-11 Perforation 501.30 501.80 13
2006-03-11 Perforation 480.50 481.00 13
2006-02-27 Perforation 895.00 896.00 13
2006-03-11 Perforation 479.40 479.90 13
2006-03-11 Perforation 475.50 476.00 13
2006-03-11 Perforation 469.00 470.00 13
2006-03-11 Perforation 459.00 459.50 13
2006-03-11 Perforation 454.30 454.80 13
2006-03-11 Perforation 417.50 418.50 13
2006-03-11 Perforation 391.70 392.20 13
2006-03-11 Perforation 366.00 367.00 13
2006-03-11 Perforation 332.20 332.70 13
2006-03-11 Perforation 239.10 239.60 13
2006-03-11 Perforation 642.00 643.00 13
2006-03-11 Perforation 227.50 228.50 13
2006-03-11 Perforation 225.50 226.60 13
2006-03-11 Perforation 211.00 213.00 13
2006-03-11 Perforation 208.00 210.00 13
2006-03-20 Fracture 208.00 643.00 0
2006-03-11 Perforation 592.00 592.50 13
2006-03-11 Perforation 586.90 587.50 13
2006-03-11 Perforation 579.70 580.20 13
2006-03-11 Perforation 581.20 581.70 13
2006-03-11 Perforation 582.60 583.10 13
2006-03-11 Perforation 571.90 572.40 13

For data sources see[4]



References