X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384251415000

Well Details

Well ID: 0384251415000
Loading map...
Location: 00/15-14-038-25W4/0
Location Alias: 00/15-14-38-25 W4M
Location Alias 2: 00/15-14-038-25 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 25
Section: 14
County/Municipality: Lacombe County
Well Name: CANSEARCH JOFFRE 15-14-38-25
Operator Name: Lynx Energy ULC
License Number: 0401825
License Date: 2008-10-03
License Status: Issued
Spud Date: 2008-10-05
Final Drill Date: 2008-10-08
Well Total Depth: 885.80 m
Surface Hole Latitude: 52.273532
Surface Hole Longitude: -113.468251

For data sources see[1][2]

Well History

Date Event
2008-10-03 Obtained License
2008-10-06 Surface Casing Operation Performed
2008-10-08 Finished Drilling
2008-10-08 Production Casing Operation Performed
2008-10-08 Rig Released
2008-10-08 Well Log Performed
2008-10-08 Well Mode changed to Drilled and Cased
2008-10-26 Well Log Performed
2008-10-27 Perforation Treatment Performed - Jet Perforation
2008-10-27 Well Log Performed
2008-11-05 Perforation Treatment Performed - Fractured
2008-11-22 Well Began Production
2008-11-22 Well Fluid changed to Gas
2008-11-22 Well Mode changed to Flowing
2013-03-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-03-06 Perforation Treatment Performed - Jet Perforation
2013-03-06 Plug Back Performed
2013-03-06 Well Fluid changed to Gas
2013-03-06 Well Mode changed to Abandoned Zone
2013-03-07 Perforation Treatment Performed - Jet Perforation
2013-03-07 Well Log Performed
2013-03-08 Perforation Treatment Performed - Multi-Stage Fracture

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-10-27 Perforation 857.10 861.50 17
2013-03-06 Perforation 543.50 545.40 13
2013-03-06 Perforation 534.50 535.80 13
2013-03-06 Perforation 530.00 531.00 13
2013-03-06 Perforation 512.00 513.00 13
2013-03-06 Perforation 505.00 506.00 13
2013-03-06 Perforation 503.50 504.50 13
2013-03-06 Perforation 495.90 497.60 13
2013-03-06 Perforation 487.90 488.50 13
2013-03-06 Perforation 434.70 435.90 13
2013-03-06 Perforation 432.80 433.90 13
2008-11-05 Fracture 857.10 861.50 0
2013-03-06 Perforation 421.40 422.10 13
2013-03-07 Perforation 415.50 416.50 13
2013-03-07 Perforation 343.70 344.20 13
2013-03-07 Perforation 309.20 310.20 13
2013-03-07 Perforation 294.00 295.00 9
2013-03-07 Perforation 287.00 287.50 9
2013-03-07 Perforation 201.60 202.90 9
2013-03-08 Multi-Stage Fracture 565.00 570.00 0
2013-03-08 Multi-Stage Fracture 557.10 558.90 0
2013-03-08 Multi-Stage Fracture 543.30 549.60 0
2013-03-06 Packing Device Capped w/Cement 840.00 848.00 0
2013-03-08 Multi-Stage Fracture 530.00 535.80 0
2013-03-08 Multi-Stage Fracture 512.00 513.00 0
2013-03-08 Multi-Stage Fracture 503.50 506.00 0
2013-03-08 Multi-Stage Fracture 495.90 497.60 0
2013-03-08 Multi-Stage Fracture 487.90 488.50 0
2013-03-08 Multi-Stage Fracture 432.80 435.90 0
2013-03-08 Multi-Stage Fracture 421.40 422.10 0
2013-03-08 Multi-Stage Fracture 415.50 416.50 0
2013-03-08 Multi-Stage Fracture 343.70 344.20 0
2013-03-08 Multi-Stage Fracture 309.20 310.20 0
2013-03-06 Perforation 569.00 570.00 13
2013-03-08 Multi-Stage Fracture 294.00 295.00 0
2013-03-08 Multi-Stage Fracture 287.00 287.50 0
2013-03-08 Multi-Stage Fracture 201.60 202.90 0
2013-03-06 Perforation 567.00 568.00 13
2013-03-06 Perforation 565.00 566.00 13
2013-03-06 Perforation 557.10 558.90 13
2013-03-06 Perforation 548.60 549.60 13
2013-03-06 Perforation 543.30 545.40 13

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-03-08 2013-03-08 N/A 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 100 N/A

For data sources see[5]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 931 0.0 0.0 0.0
2009 6243 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 7297 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 1438 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-03-06 No Incident Encountered 0.00 0.00
2013-03-11 No Incident Encountered 0.00 0.00

For data sources see[7]

References