X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384251313000

Well Details

Well ID: 0384251313000
Loading map...
Location: 00/13-13-038-25W4/0
Location Alias: 00/13-13-38-25 W4M
Location Alias 2: 00/13-13-038-25 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 25
Section: 13
County/Municipality: Lacombe County
Well Name: NAL JOFFRE 13-13-38-25
Operator Name: NAL Resources Limited
License Number: 0057161
License Date: 1976-02-19
License Status: Suspension
Spud Date: 1976-02-24
Final Drill Date: 1976-03-01
Well Total Depth: 1467.60 m
Surface Hole Latitude: 52.270506
Surface Hole Longitude: -113.451879

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-02-19 Obtained License
1976-03-01 Finished Drilling
1976-03-01 Well Mode changed to Drilled and Cased
1976-03-02 Drill Stem Test Performed
1976-03-03 Drill Stem Test Performed
1976-03-04 Production Casing Operation Performed
1976-03-13 Perforation Treatment Performed - Jet Perforation
1976-05-28 Well Began Production
1976-05-28 Well Fluid changed to Crude Oil
1976-05-28 Well Mode changed to Pumping
1994-02-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-02-09 Plug Back Performed
1994-02-09 Well Fluid changed to Crude Oil
1994-02-09 Well Mode changed to Abandoned Zone
1994-02-10 Perforation Treatment Performed - Jet Perforation
2001-03-01 Well Log Performed
2001-03-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-03-02 Plug Back Performed
2001-03-03 Well Log Performed
2001-03-06 Perforation Treatment Performed - Jet Perforation
2001-03-06 Well Log Performed
2001-03-09 Perforation Treatment Performed - Cement Plug
2001-03-09 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-03-13 Perforation 1426.50 1428.30 7
2001-03-09 Remedial Casing Cementing 530.00 531.00 0
2001-03-09 Cement Plug 443.30 531.00 0
1976-03-13 Perforation 1430.10 1432.30 7
1976-03-13 Perforation 1435.90 1437.40 7
1976-03-13 Perforation 1441.70 1442.90 7
1994-02-09 Packing Device Capped w/Cement 1357.00 1365.00 0
1994-02-10 Perforation 762.00 765.00 13
1994-02-10 Perforation 795.50 800.50 13
2001-03-02 Packing Device Capped w/Cement 745.60 755.00 0
2001-03-06 Perforation 530.00 531.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 3454 0.0 0.0 0.0
1977 4184 0.0 0.0 0.0
1978 72 0.0 0.0 0.0
1979 3875 0.0 0.0 0.0
1980 6715 0.0 0.0 0.0
1981 7647 0.0 0.0 0.0
1982 7448 0.0 0.0 0.0
1983 8029 0.0 0.0 0.0
1984 6220 0.0 0.0 0.0
1985 2662 0.0 0.0 0.0

For data sources see[5]

References