If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0384243406022 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.308497,"lon":-113.353292,"icon":""}]} |
Location: 02/06-34-038-24W4/2 | |
Location Alias: 02/06-34-38-24 W4M | |
Location Alias 2: 02/06-34-038-24 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 038 | |
Meridian: 4 | |
Range: 24 | |
Section: 34 | |
County/Municipality: Lacombe County | |
Well Name: EMBER 102 CLIVE 6-34-38-24 | |
Operator Name: Ember Resources Inc. | |
License Number: 0304316 | |
License Date: 2004-02-17 | |
License Status: Issued | |
Spud Date: 2004-06-08 | |
Final Drill Date: 2004-06-10 | |
Well Total Depth: 855.00 m | |
Surface Hole Latitude: 52.308497 | |
Surface Hole Longitude: -113.353292 |
Date | Event |
---|---|
2004-02-17 | Obtained License |
2004-06-09 | Surface Casing Operation Performed |
2004-06-10 | Finished Drilling |
2004-06-10 | Production Casing Operation Performed |
2004-06-10 | Rig Released |
2004-06-10 | Well Mode changed to Drilled and Cased |
2004-07-16 | Well Log Performed |
2004-08-26 | Perforation Treatment Performed - Jet Perforation |
2004-08-26 | Well Log Performed |
2005-10-19 | Perforation Treatment Performed - Jet Perforation |
2005-11-05 | Perforation Treatment Performed - Fractured |
2005-11-15 | Well Log Performed |
2005-11-21 | Well Began Production |
2005-11-21 | Well Fluid changed to Coalbed Methane-Coals Only |
2005-11-21 | Well Mode changed to Flowing |
2006-07-01 | Well Fluid changed to Coalbed Methane-Coals Only |
2006-07-01 | Well Mode changed to Flowing |
2007-05-15 | Well Log Performed |
2008-02-23 | Perforation Treatment Performed - Jet Perforation |
2008-02-23 | Well Log Performed |
2008-03-26 | Well Log Performed |
2009-12-15 | Well Log Performed |
2010-11-05 | Well Log Performed |
2011-11-17 | Well Log Performed |
2012-11-29 | Well Log Performed |
2013-12-13 | Well Log Performed |
2017-04-05 | Well Fluid changed to Coalbed Methane-Coals Only |
2017-04-05 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2004-08-26 | Perforation | 648.00 | 649.00 | 17 |
2005-10-19 | Perforation | 473.00 | 474.00 | 17 |
2005-10-19 | Perforation | 455.00 | 456.00 | 17 |
2005-10-19 | Perforation | 448.50 | 449.50 | 17 |
2005-10-19 | Perforation | 446.30 | 447.30 | 17 |
2005-10-19 | Perforation | 438.00 | 439.00 | 17 |
2005-10-19 | Perforation | 428.00 | 429.00 | 17 |
2005-10-19 | Perforation | 418.50 | 419.50 | 17 |
2005-10-19 | Perforation | 409.00 | 410.00 | 17 |
2005-10-19 | Perforation | 400.00 | 401.00 | 17 |
2005-10-19 | Perforation | 397.20 | 398.20 | 17 |
2004-08-26 | Perforation | 587.00 | 590.00 | 17 |
2005-10-19 | Perforation | 386.00 | 387.00 | 17 |
2005-10-19 | Perforation | 382.50 | 383.50 | 17 |
2005-10-19 | Perforation | 377.50 | 378.50 | 17 |
2005-11-05 | Fracture | 377.50 | 522.30 | 0 |
2008-02-23 | Perforation | 346.00 | 347.00 | 17 |
2008-02-23 | Perforation | 291.50 | 292.00 | 17 |
2008-02-23 | Perforation | 284.20 | 284.70 | 17 |
2008-02-23 | Perforation | 278.20 | 278.70 | 17 |
2004-08-26 | Perforation | 557.00 | 560.00 | 17 |
2005-10-19 | Perforation | 521.80 | 522.30 | 17 |
2005-10-19 | Perforation | 516.00 | 517.00 | 17 |
2005-10-19 | Perforation | 513.50 | 514.50 | 17 |
2005-10-19 | Perforation | 511.00 | 512.00 | 17 |
2005-10-19 | Perforation | 509.00 | 510.00 | 17 |
2005-10-19 | Perforation | 497.60 | 498.10 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 697 | 0.0 | 0.0 | 0.0 |
2006 | 4314 | 0.0 | 0.0 | 0.0 |
2007 | 8330 | 0.0 | 0.0 | 0.0 |
2008 | 8401 | 0.0 | 0.0 | 0.0 |
2009 | 8341 | 0.0 | 0.0 | 0.0 |
2010 | 8678 | 0.0 | 0.0 | 0.0 |
2011 | 8729 | 0.0 | 0.0 | 0.0 |
2012 | 8768 | 0.0 | 0.0 | 0.0 |
2013 | 8737 | 0.0 | 0.0 | 0.0 |
2014 | 8759 | 0.0 | 0.0 | 0.0 |
2015 | 8745 | 0.0 | 0.0 | 0.0 |
2016 | 8587 | 0.0 | 0.0 | 0.0 |
2017 | 7743 | 0.0 | 0.0 | 0.0 |
2018 | 8547 | 0.0 | 0.0 | 0.0 |
2019 | 8094 | 0.0 | 0.0 | 0.0 |
2020 | 2023 | 0.0 | 0.0 | 0.0 |
For data sources see[5]