If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0384243306000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.309948,"lon":-113.378157,"icon":""}]} |
Location: 00/06-33-038-24W4/0 | |
Location Alias: 00/06-33-38-24 W4M | |
Location Alias 2: 00/06-33-038-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 038 | |
Meridian: 4 | |
Range: 24 | |
Section: 33 | |
County/Municipality: Lacombe County | |
Well Name: CPC RESOURCES CLIVE 6-33-38-24 | |
Operator Name: Lynx Energy ULC | |
License Number: 0406415 | |
License Date: 2008-12-17 | |
License Status: Amended | |
Spud Date: 2009-02-12 | |
Final Drill Date: 2009-02-14 | |
Well Total Depth: 870.00 m | |
Surface Hole Latitude: 52.309948 | |
Surface Hole Longitude: -113.378157 |
Date | Event |
---|---|
2008-12-17 | Obtained License |
2009-02-12 | Surface Casing Operation Performed |
2009-02-13 | Production Casing Operation Performed |
2009-02-14 | Finished Drilling |
2009-02-14 | Rig Released |
2009-02-14 | Well Mode changed to Drilled and Cased |
2009-02-26 | Perforation Treatment Performed - Jet Perforation |
2009-03-02 | Perforation Treatment Performed - Jet Perforation |
2009-03-03 | Perforation Treatment Performed - Fractured |
2009-03-03 | Well Fluid changed to Coalbed Methane-Coals and Other |
2009-03-03 | Well Mode changed to Testing |
2014-02-14 | Well Began Production |
2014-02-14 | Well Fluid changed to Coalbed Methane-Coals and Other |
2014-02-14 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-02-26 | Perforation | 788.00 | 791.00 | 13 |
2009-03-02 | Perforation | 487.00 | 488.00 | 7 |
2009-03-02 | Perforation | 474.00 | 475.00 | 7 |
2009-03-02 | Perforation | 461.00 | 462.00 | 7 |
2009-03-02 | Perforation | 423.00 | 424.00 | 7 |
2009-03-02 | Perforation | 413.00 | 415.00 | 7 |
2009-03-02 | Perforation | 406.80 | 407.80 | 7 |
2009-03-02 | Perforation | 404.00 | 405.00 | 7 |
2009-03-02 | Perforation | 399.20 | 400.20 | 7 |
2009-03-02 | Perforation | 395.00 | 396.00 | 7 |
2009-03-02 | Perforation | 391.00 | 392.00 | 7 |
2009-02-26 | Perforation | 785.50 | 787.00 | 13 |
2009-03-02 | Perforation | 355.00 | 359.00 | 7 |
2009-03-02 | Perforation | 311.50 | 313.00 | 7 |
2009-03-02 | Perforation | 302.00 | 303.00 | 7 |
2009-03-02 | Perforation | 290.00 | 291.00 | 7 |
2009-03-03 | Fracture | 528.00 | 529.00 | 0 |
2009-03-03 | Fracture | 520.50 | 524.00 | 0 |
2009-03-03 | Fracture | 506.80 | 511.80 | 0 |
2009-03-03 | Fracture | 499.50 | 500.50 | 0 |
2009-03-03 | Fracture | 487.00 | 488.00 | 0 |
2009-03-03 | Fracture | 474.00 | 475.00 | 0 |
2009-03-02 | Perforation | 599.50 | 600.50 | 7 |
2009-03-03 | Fracture | 461.00 | 462.00 | 0 |
2009-03-03 | Fracture | 423.00 | 424.00 | 0 |
2009-03-03 | Fracture | 413.00 | 415.00 | 0 |
2009-03-03 | Fracture | 404.00 | 407.80 | 0 |
2009-03-03 | Fracture | 395.00 | 400.20 | 0 |
2009-03-03 | Fracture | 391.00 | 392.00 | 0 |
2009-03-03 | Fracture | 355.00 | 359.00 | 0 |
2009-03-03 | Fracture | 311.50 | 313.00 | 0 |
2009-03-03 | Fracture | 302.00 | 303.00 | 0 |
2009-03-03 | Fracture | 290.00 | 291.00 | 0 |
2009-03-02 | Perforation | 582.00 | 583.50 | 7 |
2009-03-02 | Perforation | 528.00 | 529.00 | 7 |
2009-03-02 | Perforation | 520.50 | 524.00 | 7 |
2009-03-02 | Perforation | 510.80 | 511.80 | 7 |
2009-03-02 | Perforation | 506.80 | 507.80 | 7 |
2009-03-02 | Perforation | 499.50 | 500.50 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 120 | 0.0 | 0.0 | 0.0 |
2014 | 7151 | 0.0 | 0.0 | 0.0 |
2015 | 8755 | 0.0 | 0.0 | 0.0 |
2016 | 8759 | 0.0 | 0.0 | 0.0 |
2017 | 8737 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8711 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2009-02-26 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]