X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384242815020

Well Details

Well ID: 0384242815020
Loading map...
Location: 02/15-28-038-24W4/0
Location Alias: 02/15-28-38-24 W4M
Location Alias 2: 02/15-28-038-24 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 24
Section: 28
County/Municipality: Lacombe County
Well Name: EMBER 102 HAYNES 15-28-38-24
Operator Name: Ember Resources Inc.
License Number: 0143454
License Date: 1990-02-27
License Status: Suspension
Spud Date: 1990-03-02
Final Drill Date: 1990-03-11
Well Total Depth: 1940.00 m
Surface Hole Latitude: 52.301457
Surface Hole Longitude: -113.369303

For data sources see[1][2]

Well History

Date Event
1990-02-27 Obtained License
1990-03-04 Surface Casing Operation Performed
1990-03-11 Finished Drilling
1990-03-11 Well Log Performed
1990-03-11 Well Mode changed to Drilled and Cased
1990-03-13 Drill Stem Test Performed
1990-03-14 Drill Stem Test Performed
1990-03-15 Lost Circulation Occurred
1990-03-15 Production Casing Operation Performed
1990-03-15 Rig Released
1990-04-12 Well Log Performed
1990-04-17 Well Log Performed
1990-04-18 Perforation Treatment Performed - Jet Perforation
1990-04-18 Well Began Production
1990-04-18 Well Fluid changed to Crude Oil
1990-04-18 Well Mode changed to Flowing
1990-11-05 Well Fluid changed to Crude Oil
1990-11-05 Well Mode changed to Pumping
1991-04-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-04-26 Plug Back Performed
1991-04-26 Well Fluid changed to Crude Oil
1991-04-26 Well Mode changed to Abandoned Zone
1991-04-27 Perforation Treatment Performed - Jet Perforation
1991-04-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-06-16 Perforation Treatment Performed - Cement Squeeze
1991-06-18 Perforation Treatment Performed - Jet Perforation
1991-06-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-06-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-06-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-10-07 Perforation Treatment Performed - Jet Perforation
1992-10-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-10-12 Well Fluid changed to Crude Oil
1992-10-12 Well Mode changed to Pumping
1992-10-17 Well Fluid changed to Crude Oil
1992-10-17 Well Mode changed to Suspended
1992-12-05 Perforation Treatment Performed - Cement Squeeze
1992-12-05 Plug Back Performed
1992-12-09 Perforation Treatment Performed - Jet Perforation
1992-12-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-02-15 Well Began Injection
1993-02-15 Well Fluid changed to Water
1993-02-15 Well Type changed to Disposal
2001-11-01 Well Fluid changed to Water
2001-11-01 Well Mode changed to Suspended
2001-11-01 Well Type changed to Disposal
2002-02-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-02-04 Plug Back Performed
2002-02-04 Well Fluid changed to Water
2002-02-04 Well Log Performed
2002-02-04 Well Mode changed to Abandoned Zone
2002-02-04 Well Type changed to Disposal
2002-02-05 Well Log Performed
2002-02-06 Perforation Treatment Performed - Jet Perforation
2002-02-06 Well Log Performed
2002-02-07 Perforation Treatment Performed - Remedial Casing
2010-11-29 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-04-18 Perforation 1898.20 1899.80 14
1991-06-21 Acid Treatment 1868.00 1870.80 0
1991-06-22 Acid Treatment 1868.00 1870.80 0
1992-10-07 Perforation 1898.20 1899.80 14
1992-10-09 Acid Treatment 1898.20 1899.80 0
1992-12-05 Cement Squeeze 1868.00 1899.80 0
1992-12-09 Perforation 1921.00 1926.00 13
1992-12-10 Acid Treatment 1921.00 1926.00 0
2002-02-04 Packing Device Capped w/Cement 1887.00 1895.00 0
2002-02-04 Packing Device Capped w/Cement 1858.00 1866.00 0
2002-02-06 Perforation 814.00 816.00 17
1991-04-26 Packing Device Capped w/Cement 1887.00 1895.00 0
2002-02-06 Perforation 824.00 826.00 17
2002-02-07 Remedial Casing Cementing 814.00 826.00 0
1991-04-27 Perforation 1868.00 1870.80 24
1991-04-27 Perforation 1874.00 1875.00 24
1991-04-27 Perforation 1876.20 1878.20 24
1991-04-29 Acid Treatment 1868.00 1878.20 0
1991-06-16 Cement Squeeze 1868.00 1878.20 0
1991-06-18 Perforation 1868.00 1870.80 14
1991-06-19 Acid Treatment 1868.00 1870.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 5486 0.0 0.0 0.0
1991 2042 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1990-03-15 Lost Circulation 1940.00 1940.00

For data sources see[6]

References