X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384242809004

Well Details

Well ID: 0384242809004
Loading map...
Location: 00/09-28-038-24W4/4
Location Alias: 00/09-28-38-24 W4M
Location Alias 2: 00/09-28-038-24 W4/04
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 24
Section: 28
County/Municipality: Lacombe County
Well Name: EMBER HAYNES 9-28-38-24
Operator Name: Ember Resources Inc.
License Number: 0202692
License Date: 1997-06-19
License Status: Suspension
Spud Date: 1997-06-21
Final Drill Date: 1997-07-01
Well Total Depth: 1925.00 m
Surface Hole Latitude: 52.299283
Surface Hole Longitude: -113.368006

For data sources see[1][2]

Well History

Date Event
1997-06-19 Obtained License
1997-06-22 Surface Casing Operation Performed
1997-07-01 Finished Drilling
1997-07-01 Well Mode changed to Drilled and Cased
1997-07-02 Well Log Performed
1997-07-03 Production Casing Operation Performed
1997-07-04 Rig Released
1997-07-09 Well Log Performed
1997-07-10 Perforation Treatment Performed - Jet Perforation
1997-07-10 Well Log Performed
1997-07-15 Perforation Treatment Performed - Cement Squeeze
1997-07-15 Perforation Treatment Performed - Jet Perforation
1997-07-15 Well Log Performed
1997-07-17 Perforation Treatment Performed - Jet Perforation
1997-07-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-07-18 Well Log Performed
1997-11-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-11-24 Well Log Performed
1997-11-25 Perforation Treatment Performed - Jet Perforation
1997-11-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-11-26 Well Log Performed
2001-05-12 Perforation Treatment Performed - Jet Perforation
2001-05-12 Well Log Performed
2001-05-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-05-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-05-14 Plug Back Performed
2001-05-15 Perforation Treatment Performed - Jet Perforation
2001-05-15 Well Log Performed
2001-05-17 Perforation Treatment Performed - Jet Perforation
2001-05-17 Well Log Performed
2001-06-08 Perforation Treatment Performed - Jet Perforation
2001-06-08 Well Log Performed
2001-12-31 Well Log Performed
2002-01-02 Well Log Performed
2002-02-09 Perforation Treatment Performed - Cement Squeeze
2002-02-09 Plug Back Performed
2002-02-09 Well Mode changed to Abandoned Zone
2002-02-11 Well Log Performed
2002-02-12 Perforation Treatment Performed - Jet Perforation
2002-02-12 Well Log Performed
2002-02-13 Perforation Treatment Performed - Remedial Casing
2002-02-15 Perforation Treatment Performed - Jet Perforation
2002-02-16 Perforation Treatment Performed - Remedial Casing
2002-02-20 Well Log Performed
2002-02-21 Perforation Treatment Performed - Jet Perforation
2002-02-21 Well Log Performed
2002-02-22 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-07-10 Perforation 1896.00 1897.50 13
2001-05-13 Acid Treatment 1867.00 1870.50 0
2001-05-14 Packing Device Capped w/Cement 1865.00 1873.00 0
2001-05-14 Packing Device Capped w/Cement 1857.00 1865.00 0
2001-05-15 Perforation 1607.00 1608.50 13
2001-05-17 Perforation 1608.50 1610.00 13
2001-06-08 Perforation 1541.50 1543.00 17
2002-02-09 Cement Squeeze 1541.50 1543.00 0
2002-02-12 Perforation 1508.00 1509.00 20
2002-02-13 Remedial Casing Cementing 1508.00 1509.00 0
2002-02-15 Perforation 833.00 834.00 20
1997-07-15 Perforation 1904.80 1906.20 13
2002-02-16 Remedial Casing Cementing 833.00 834.00 0
2002-02-21 Perforation 513.00 515.00 20
2002-02-22 Remedial Casing Cementing 513.00 515.00 0
1997-07-15 Cement Squeeze 1896.00 1906.20 0
1997-07-17 Perforation 1896.00 1897.50 14
1997-07-18 Acid Treatment 1896.00 1897.50 0
1997-11-23 Packing Device Capped w/Cement 1876.00 1884.00 0
1997-11-25 Perforation 1874.00 1878.00 18
1997-11-26 Acid Treatment 1874.00 1878.00 0
2001-05-12 Perforation 1867.00 1870.50 13

For data sources see[4]



References