X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384242604000

Well Details

Well ID: 0384242604000
Loading map...
Location: 00/04-26-038-24W4/0
Location Alias: 00/04-26-38-24 W4M
Location Alias 2: 00/04-26-038-24 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 24
Section: 26
County/Municipality: Lacombe County
Well Name: SPYGLASS HAYNES 4-26-38-24
Operator Name: Spyglass Resources Corp.
License Number: 0086840
License Date: 1980-11-05
License Status: RecCertified
Spud Date: 1980-11-26
Final Drill Date: 1980-12-03
Well Total Depth: 1917.00 m
Surface Hole Latitude: 52.291387
Surface Hole Longitude: -113.334128

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-11-05 Obtained License
1980-12-03 Finished Drilling
1980-12-03 Well Mode changed to Drilled and Cased
1980-12-06 Drill Stem Test Performed
1980-12-07 Production Casing Operation Performed
1981-01-07 Perforation Treatment Performed - Jet Perforation
1981-01-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-01-14 Perforation Treatment Performed - Cement Squeeze
1981-01-15 Perforation Treatment Performed - Acid Wash - No Pressure
1981-01-15 Perforation Treatment Performed - Jet Perforation
1981-01-21 Perforation Treatment Performed - Cement Squeeze
1981-01-22 Perforation Treatment Performed - Acid Wash - No Pressure
1981-01-22 Perforation Treatment Performed - Jet Perforation
1981-02-17 Well Began Production
1981-02-17 Well Fluid changed to Crude Oil
1981-02-17 Well Mode changed to Flowing
1985-11-15 Perforation Treatment Performed - Jet Perforation
1985-11-15 Well Log Performed
1985-11-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-07-01 Well Fluid changed to Crude Oil
1986-07-01 Well Mode changed to Suspended
1986-10-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-10-25 Plug Back Performed
1986-10-25 Well Fluid changed to Crude Oil
1986-10-25 Well Log Performed
1986-10-25 Well Mode changed to Abandoned Zone
1986-10-27 Perforation Treatment Performed - Jet Perforation
2000-08-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-08-16 Plug Back Performed
2000-08-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-08-17 Perforation Treatment Performed - Jet Perforation
2000-08-17 Perforation Treatment Performed - Remedial Casing
2000-09-23 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-01-07 Perforation 1857.50 1858.50 13
1985-11-16 Acid Treatment 1850.30 1855.50 0
1986-10-25 Packing Device Capped w/Cement 1832.00 1840.00 0
1986-10-27 Perforation 1505.50 1507.00 13
2000-08-16 Packing Device Capped w/Cement 1485.80 1493.80 0
2000-08-17 Packing Device Capped w/Cement 742.00 750.00 0
2000-08-17 Perforation 440.00 441.00 13
2000-08-17 Remedial Casing Cementing 440.00 441.00 0
1981-01-09 Acid Treatment 1857.50 1858.50 0
1981-01-14 Cement Squeeze 1857.50 1858.50 0
1981-01-15 Perforation 1854.50 1855.50 13
1981-01-15 Acid Wash 1854.50 1855.50 0
1981-01-21 Cement Squeeze 1854.50 1855.50 0
1981-01-22 Perforation 1850.30 1851.30 13
1981-01-22 Acid Wash 1850.30 1851.30 0
1985-11-15 Perforation 1853.00 1855.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 2577 0.0 0.0 0.0
1982 4348 0.0 0.0 0.0
1983 6388 0.0 0.0 0.0
1984 5807 0.0 0.0 0.0
1985 274 0.0 0.0 0.0
1986 3077 0.0 0.0 0.0

For data sources see[5]

References