X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384241616000

Well Details

Well ID: 0384241616000
Loading map...
Location: 00/16-16-038-24W4/0
Location Alias: 00/16-16-38-24 W4M
Location Alias 2: 00/16-16-038-24 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 24
Section: 16
County/Municipality: Lacombe County
Well Name: ENHANCEENERGY HAYNES 16-16-38-24
Operator Name: Enhance Energy Inc.
License Number: 0034575
License Date: 1968-08-06
License Status: Issued
Spud Date: 1968-08-14
Final Drill Date: 1968-08-28
Well Total Depth: 1947.10 m
Surface Hole Latitude: 52.271920
Surface Hole Longitude: -113.365751

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-08-06 Obtained License
1968-08-28 Finished Drilling
1968-08-30 Drill Stem Test Performed
1968-08-31 Drill Stem Test Performed
1968-09-01 Production Casing Operation Performed
1968-09-05 Perforation Treatment Performed - Abrasa-Jet Perforation
1968-09-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-05-09 Well Mode changed to Drilled and Cased
1970-10-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-10-19 Perforation Treatment Performed - Cement Squeeze
1970-10-20 Perforation Treatment Performed - Jet Perforation
1970-10-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-11-27 Well Began Injection
1970-11-27 Well Fluid changed to Water
1970-11-27 Well Type changed to Disposal
1984-01-25 Well Log Performed
1991-06-15 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-09-05 Hydra Jet Perforation 1821.80 1821.80 0
1991-06-15 Acid Treatment 1902.00 1908.00 0
1968-09-05 Hydra Jet Perforation 1801.10 1801.10 0
1968-09-05 Acid Treatment 1821.80 1821.80 0
1968-09-05 Acid Treatment 1801.10 1801.10 0
1970-10-19 Cement Squeeze 1827.90 1827.90 0
1970-10-19 Acid Treatment 1800.50 1800.50 0
1970-10-19 Cement Squeeze 1800.50 1800.50 0
1970-10-20 Perforation 1902.00 1908.00 13
1970-10-21 Acid Treatment 1902.00 1908.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

References