If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0384241503000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.261511,"lon":-113.354334,"icon":""}]} |
Location: 00/03-15-038-24W4/0 | |
Location Alias: 00/03-15-38-24 W4M | |
Location Alias 2: 00/03-15-038-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 038 | |
Meridian: 4 | |
Range: 24 | |
Section: 15 | |
County/Municipality: Lacombe County | |
Well Name: EMBER HAYNES 3-15-38-24 | |
Operator Name: Ember Resources Inc. | |
License Number: 0432639 | |
License Date: 2011-03-29 | |
License Status: Amended | |
Spud Date: 2011-10-13 | |
Final Drill Date: 2011-10-14 | |
Well Total Depth: 946.50 m | |
Surface Hole Latitude: 52.261511 | |
Surface Hole Longitude: -113.354334 |
Date | Event |
---|---|
2011-03-29 | Obtained License |
2011-10-13 | Direction Drilling Operation Performed - Deviate |
2011-10-13 | Surface Casing Operation Performed |
2011-10-14 | Finished Drilling |
2011-10-14 | Production Casing Operation Performed |
2011-10-14 | Well Mode changed to Drilled and Cased |
2011-10-15 | Rig Released |
2011-10-25 | Well Log Performed |
2011-11-10 | Perforation Treatment Performed - Jet Perforation |
2011-11-13 | Perforation Treatment Performed - Fractured |
2011-11-16 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-11-16 | Well Mode changed to Testing |
2011-11-25 | Well Began Production |
2011-11-25 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-11-25 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-10-13 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-11-10 | Perforation | 362.20 | 363.20 | 13 |
2011-11-10 | Perforation | 505.70 | 506.20 | 13 |
2011-11-10 | Perforation | 514.00 | 515.00 | 13 |
2011-11-10 | Perforation | 522.00 | 523.50 | 13 |
2011-11-10 | Perforation | 524.10 | 524.60 | 13 |
2011-11-10 | Perforation | 546.80 | 547.30 | 13 |
2011-11-10 | Perforation | 550.00 | 550.50 | 13 |
2011-11-10 | Perforation | 562.50 | 563.00 | 13 |
2011-11-10 | Perforation | 568.30 | 569.80 | 13 |
2011-11-10 | Perforation | 573.50 | 574.50 | 13 |
2011-11-10 | Perforation | 591.90 | 592.90 | 13 |
2011-11-10 | Perforation | 368.10 | 369.10 | 13 |
2011-11-10 | Perforation | 593.50 | 594.50 | 13 |
2011-11-10 | Perforation | 598.30 | 598.80 | 13 |
2011-11-10 | Perforation | 599.40 | 599.90 | 13 |
2011-11-10 | Perforation | 618.60 | 619.10 | 13 |
2011-11-10 | Perforation | 632.60 | 633.60 | 13 |
2011-11-10 | Perforation | 634.80 | 635.80 | 13 |
2011-11-10 | Perforation | 642.00 | 643.50 | 13 |
2011-11-10 | Perforation | 696.90 | 698.40 | 13 |
2011-11-13 | Fracture | 362.20 | 643.50 | 0 |
2011-11-10 | Perforation | 377.80 | 378.30 | 13 |
2011-11-10 | Perforation | 402.70 | 403.20 | 13 |
2011-11-10 | Perforation | 408.70 | 409.20 | 13 |
2011-11-10 | Perforation | 435.10 | 435.60 | 13 |
2011-11-10 | Perforation | 444.30 | 444.80 | 13 |
2011-11-10 | Perforation | 493.30 | 499.80 | 13 |
2011-11-10 | Perforation | 504.10 | 504.60 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 888 | 0.0 | 0.0 | 0.0 |
2012 | 8176 | 0.0 | 0.0 | 0.0 |
2013 | 8394 | 0.0 | 0.0 | 0.0 |
2014 | 8532 | 0.0 | 0.0 | 0.0 |
2015 | 8754 | 0.0 | 0.0 | 0.0 |
2016 | 8753 | 0.0 | 0.0 | 0.0 |
2017 | 8676 | 0.0 | 0.0 | 0.0 |
2018 | 8742 | 0.0 | 0.0 | 0.0 |
2019 | 8700 | 0.0 | 0.0 | 0.0 |
2020 | 2171 | 0.0 | 0.0 | 0.0 |
For data sources see[6]