If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0384241412000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.269137,"lon":-113.333835,"icon":""}]} |
Location: 00/12-14-038-24W4/0 | |
Location Alias: 00/12-14-38-24 W4M | |
Location Alias 2: 00/12-14-038-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 038 | |
Meridian: 4 | |
Range: 24 | |
Section: 14 | |
County/Municipality: Lacombe County | |
Well Name: ENHANCEENERGY HAYNES 12-14-38-24 | |
Operator Name: Enhance Energy Inc. | |
License Number: 0034574 | |
License Date: 1968-08-06 | |
License Status: Suspension | |
Spud Date: 1968-09-18 | |
Final Drill Date: 1968-09-27 | |
Well Total Depth: 1889.80 m | |
Surface Hole Latitude: 52.269137 | |
Surface Hole Longitude: -113.333835 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1968-08-06 | Obtained License |
1968-09-27 | Finished Drilling |
1968-09-27 | Well Mode changed to Drilled and Cased |
1968-09-30 | Drill Stem Test Performed |
1968-10-01 | Drill Stem Test Performed |
1968-10-02 | Drill Stem Test Performed |
1968-10-03 | Drill Stem Test Performed |
1968-10-04 | Drill Stem Test Performed |
1968-10-04 | Production Casing Operation Performed |
1968-10-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1968-10-18 | Perforation Treatment Performed - Cement Squeeze |
1968-10-18 | Perforation Treatment Performed - Jet Perforation |
1968-10-20 | Perforation Treatment Performed - Jet Perforation |
1968-10-21 | Perforation Treatment Performed - Acid Wash - No Pressure |
1968-10-23 | Perforation Treatment Performed - Acid Wash - No Pressure |
1968-10-28 | Perforation Treatment Performed - Jet Perforation |
1968-10-29 | Perforation Treatment Performed - Acid Wash - No Pressure |
1968-11-02 | Perforation Treatment Performed - Acid Wash - No Pressure |
1968-11-06 | Well Began Production |
1968-11-06 | Well Fluid changed to Crude Oil |
1968-11-06 | Well Mode changed to Flowing |
1976-05-01 | Well Fluid changed to Crude Oil |
1976-05-01 | Well Mode changed to Flowing |
1979-05-31 | Well Fluid changed to Crude Oil |
1979-05-31 | Well Mode changed to Suspended |
1979-08-01 | Well Fluid changed to Crude Oil |
1979-08-01 | Well Mode changed to Flowing |
1998-05-17 | Well Fluid changed to Crude Oil |
1998-05-17 | Well Mode changed to Pumping |
2004-02-07 | Perforation Treatment Performed - Jet Perforation |
2004-02-07 | Well Log Performed |
2004-02-08 | Well Log Performed |
2004-02-09 | Perforation Treatment Performed - Cement Squeeze |
2004-02-13 | Perforation Treatment Performed - Jet Perforation |
2004-02-13 | Well Log Performed |
2013-02-01 | Well Fluid changed to Crude Oil |
2013-02-01 | Well Mode changed to Suspended |
2019-03-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-03-06 | Perforation Treatment Performed - Cement Squeeze |
2019-03-06 | Plug Back Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1968-10-18 | Perforation | 1848.30 | 1848.90 | 7 |
1968-11-02 | Acid Wash | 1846.80 | 1848.00 | 0 |
2004-02-07 | Perforation | 1840.30 | 1841.50 | 17 |
2004-02-09 | Cement Squeeze | 1840.30 | 1841.50 | 0 |
2004-02-13 | Perforation | 1838.50 | 1839.70 | 17 |
2019-03-06 | Cement Squeeze | 1838.50 | 1848.00 | 0 |
2019-03-06 | Packing Device Capped w/Cement | 1710.00 | 1830.00 | 0 |
1968-10-18 | Perforation | 1852.60 | 1853.80 | 13 |
1968-10-18 | Acid Treatment | 1848.30 | 1853.80 | 0 |
1968-10-18 | Cement Squeeze | 1848.30 | 1853.80 | 0 |
1968-10-20 | Perforation | 1852.60 | 1853.20 | 7 |
1968-10-21 | Acid Wash | 1852.60 | 1853.20 | 0 |
1968-10-23 | Acid Wash | 1852.60 | 1853.20 | 0 |
1968-10-28 | Perforation | 1846.80 | 1848.00 | 13 |
1968-10-29 | Acid Wash | 1846.80 | 1848.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1968 | 379 | 0.0 | 0.0 | 0.0 |
1969 | 2196 | 0.0 | 0.0 | 0.0 |
1970 | 1764 | 0.0 | 0.0 | 0.0 |
1971 | 3037 | 0.0 | 0.0 | 0.0 |
1972 | 6159 | 0.0 | 0.0 | 0.0 |
1973 | 7977 | 0.0 | 0.0 | 0.0 |
1974 | 5491 | 0.0 | 0.0 | 0.0 |
1975 | 3943 | 0.0 | 0.0 | 0.0 |
1976 | 5268 | 0.0 | 0.0 | 0.0 |
1977 | 4417 | 0.0 | 0.0 | 0.0 |
1978 | 2419 | 0.0 | 0.0 | 0.0 |
1979 | 2003 | 0.0 | 0.0 | 0.0 |
1980 | 1560 | 0.0 | 0.0 | 0.0 |
1981 | 1910 | 0.0 | 0.0 | 0.0 |
1982 | 2688 | 0.0 | 0.0 | 0.0 |
1983 | 2752 | 0.0 | 0.0 | 0.0 |
1984 | 4560 | 0.0 | 0.0 | 0.0 |
1985 | 3746 | 0.0 | 0.0 | 0.0 |
1986 | 2430 | 0.0 | 0.0 | 0.0 |
1987 | 2494 | 0.0 | 0.0 | 0.0 |
1988 | 2882 | 0.0 | 0.0 | 0.0 |
1989 | 3621 | 0.0 | 0.0 | 0.0 |
1990 | 3807 | 0.0 | 0.0 | 0.0 |
1991 | 4823 | 0.0 | 0.0 | 0.0 |
1992 | 5191 | 0.0 | 0.0 | 0.0 |
1993 | 3934 | 0.0 | 0.0 | 0.0 |
1994 | 4002 | 0.0 | 0.0 | 0.0 |
1995 | 4166 | 0.0 | 0.0 | 0.0 |
1996 | 5670 | 0.0 | 0.0 | 0.0 |
1997 | 7722 | 0.0 | 0.0 | 0.0 |
1998 | 7748 | 0.0 | 0.0 | 0.0 |
1999 | 8312 | 0.0 | 0.0 | 0.0 |
2000 | 8235 | 0.0 | 0.0 | 0.0 |
2001 | 8282 | 0.0 | 0.0 | 0.0 |
2002 | 8076 | 0.0 | 0.0 | 0.0 |
2003 | 8640 | 0.0 | 0.0 | 0.0 |
2004 | 8337 | 0.0 | 0.0 | 0.0 |
2005 | 8374 | 0.0 | 0.0 | 0.0 |
2006 | 8730 | 0.0 | 0.0 | 0.0 |
2007 | 8532 | 0.0 | 0.0 | 0.0 |
2008 | 7820 | 0.0 | 0.0 | 0.0 |
2009 | 7606 | 0.0 | 0.0 | 0.0 |
2010 | 70 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-03-06 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]