X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384241111000

Well Details

Well ID: 0384241111000
Loading map...
Location: 00/11-11-038-24W4/0
Location Alias: 00/11-11-38-24 W4M
Location Alias 2: 00/11-11-038-24 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 24
Section: 11
County/Municipality: Lacombe County
Well Name: ENHANCEENERGY HAYNES 11-11-38-24
Operator Name: Enhance Energy Inc.
License Number: 0108434
License Date: 1984-07-27
License Status: Suspension
Spud Date: 1984-08-03
Final Drill Date: 1984-08-16
Well Total Depth: 1900.00 m
Surface Hole Latitude: 52.254842
Surface Hole Longitude: -113.330548

For data sources see[1][2]

Well History

Date Event
1984-07-27 Obtained License
1984-08-03 Lost Circulation Occurred
1984-08-05 Surface Casing Operation Performed
1984-08-16 Drill Stem Test Performed
1984-08-16 Finished Drilling
1984-08-16 Well Log Performed
1984-08-16 Well Mode changed to Drilled and Cased
1984-08-18 Production Casing Operation Performed
1984-08-19 Rig Released
1984-09-27 Well Log Performed
1984-09-29 Perforation Treatment Performed - Jet Perforation
1984-09-30 Well Log Performed
1984-10-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-10-01 Perforation Treatment Performed - Jet Perforation
1984-10-02 Well Began Production
1984-10-02 Well Fluid changed to Crude Oil
1984-10-02 Well Mode changed to Pumping
1996-07-09 Well Log Performed
1996-07-10 Well Log Performed
1996-07-11 Perforation Treatment Performed - Jet Perforation
1996-07-11 Perforation Treatment Performed - Remedial Casing
1996-07-15 Well Log Performed
1996-07-16 Perforation Treatment Performed - Jet Perforation
2002-05-15 Perforation Treatment Performed - Jet Perforation
2002-06-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-06-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-08-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-08-30 Plug Back Performed
2004-08-30 Well Log Performed
2004-09-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-09-05 Plug Back Performed
2004-09-05 Well Fluid changed to Crude Oil
2004-09-05 Well Mode changed to Abandoned and Whipstocked

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-09-29 Perforation 1861.50 1862.50 13
2002-06-19 Acid Treatment 1838.00 1839.50 0
2002-06-21 Acid Treatment 1836.00 1837.00 0
2004-08-30 Packing Device Capped w/Cement 1838.00 1846.00 0
2004-09-05 Packing Device Capped w/Cement 1818.80 1827.20 0
1984-10-01 Packing Device Capped w/Cement 1860.00 1860.00 0
1984-10-01 Perforation 1850.00 1852.00 13
1996-07-11 Perforation 375.00 376.00 20
1996-07-11 Remedial Casing Cementing 375.00 376.00 0
1996-07-16 Perforation 1842.50 1844.00 13
2002-05-15 Perforation 1840.50 1841.60 17
2002-05-15 Perforation 1838.00 1839.50 17
2002-05-15 Perforation 1836.00 1837.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 1400 0.0 0.0 0.0
1985 8109 0.0 0.0 0.0
1986 8670 0.0 0.0 0.0
1987 8361 0.0 0.0 0.0
1988 8446 0.0 0.0 0.0
1989 7783 0.0 0.0 0.0
1990 8745 0.0 0.0 0.0
1991 7951 0.0 0.0 0.0
1992 8690 0.0 0.0 0.0
1993 3530 0.0 0.0 0.0
1995 48 0.0 0.0 0.0
1996 2832 0.0 0.0 0.0
1997 7393 0.0 0.0 0.0
1998 8304 0.0 0.0 0.0
1999 8157 0.0 0.0 0.0
2000 8315 0.0 0.0 0.0
2001 8324 0.0 0.0 0.0
2002 7739 0.0 0.0 0.0
2003 8709 0.0 0.0 0.0
2004 5672 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1984-08-03 Lost Circulation 50.00 50.00
2016-09-11 No Incident Encountered 0.00 0.00

For data sources see[6]

References