X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384241016000

Well Details

Well ID: 0384241016000
Loading map...
Location: 00/16-10-038-24W4/0
Location Alias: 00/16-10-38-24 W4M
Location Alias 2: 00/16-10-038-24 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 24
Section: 10
County/Municipality: Lacombe County
Well Name: DIASHAM SUPTST HAYNES 16-10-38-24
Operator Name: Brae Canada Ltd.
License Number: 0034758
License Date: 1968-09-06
License Status: Re-Entered
Spud Date: 1968-09-08
Final Drill Date: 1968-09-22
Well Total Depth: 1905.00 m
Surface Hole Latitude: 52.257263
Surface Hole Longitude: -113.341927

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-09-06 Obtained License
1968-09-19 Drill Stem Test Performed
1968-09-21 Drill Stem Test Performed
1968-09-22 Finished Drilling
1968-09-22 Well Mode changed to Drilled and Cased
1968-09-23 Production Casing Operation Performed
1968-10-01 Perforation Treatment Performed - Jet Perforation
1968-10-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-10-03 Perforation Treatment Performed - Cement Squeeze
1968-10-04 Perforation Treatment Performed - Jet Perforation
1968-10-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-10-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-10-08 Well Began Production
1968-10-08 Well Fluid changed to Crude Oil
1968-10-08 Well Mode changed to Flowing
1968-11-25 Perforation Treatment Performed - Acid Wash - No Pressure
1968-12-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-12-01 Perforation Treatment Performed - Jet Perforation
1968-12-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-06-20 Well Fluid changed to Crude Oil
1970-06-20 Well Mode changed to Suspended
1971-07-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1971-07-26 Well Abandoned
1971-07-26 Well Fluid changed to Crude Oil
1971-07-26 Well Mode changed to Abandoned and Re-entered
2005-04-08 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-10-01 Perforation 1864.20 1865.40 13
1968-12-02 Acid Treatment 1858.70 1860.20 0
1971-07-26 Packing Device Capped w/Cement 1842.50 1850.10 0
1968-10-02 Acid Treatment 1864.20 1865.40 0
1968-10-03 Cement Squeeze 1864.20 1865.40 0
1968-10-04 Perforation 1861.10 1862.30 13
1968-10-05 Acid Treatment 1861.10 1862.30 0
1968-10-06 Acid Treatment 1861.10 1862.30 0
1968-11-25 Acid Wash 1861.10 1865.40 0
1968-12-01 Perforation 1858.70 1860.20 13
1968-12-01 Acid Treatment 1858.70 1860.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1968 47 0.0 0.0 0.0
1969 1630 0.0 0.0 0.0
1970 432 0.0 0.0 0.0

For data sources see[5]

References