X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384233110000

Well Details

Well ID: 0384233110000
Loading map...
Location: 00/10-31-038-23W4/0
Location Alias: 00/10-31-38-23 W4M
Location Alias 2: 00/10-31-038-23 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 23
Section: 31
County/Municipality: Lacombe County
Well Name: NORWEST ET AL ARDLEY 10-31-38-23
Operator Name: Canadian Natural Resources Limited
License Number: 0108240
License Date: 1984-07-17
License Status: RecCertified
Spud Date: 1984-07-31
Final Drill Date: 1984-08-10
Well Total Depth: 1784.00 m
Surface Hole Latitude: 52.311952
Surface Hole Longitude: -113.274561

For data sources see[1][2]

Well History

Date Event
1984-07-17 Obtained License
1984-08-02 Surface Casing Operation Performed
1984-08-10 Finished Drilling
1984-08-10 Well Log Performed
1984-08-11 Drill Stem Test Performed
1984-08-13 Drill Stem Test Performed
1984-08-15 Production Casing Operation Performed
1984-08-16 Rig Released
1984-08-16 Well Mode changed to Drilled and Cased
1984-09-03 Perforation Treatment Performed - Jet Perforation
1984-09-03 Well Log Performed
1984-09-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-09-05 Perforation Treatment Performed - Jet Perforation
1984-09-05 Plug Back Performed
1984-09-05 Well Log Performed
1984-09-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-10-04 Well Began Production
1984-10-04 Well Fluid changed to Crude Oil
1984-10-04 Well Mode changed to Flowing
1988-10-13 Well Fluid changed to Crude Oil
1988-10-13 Well Mode changed to Pumping
1992-02-24 Well Fluid changed to Crude Oil
1992-02-24 Well Mode changed to Suspended
1993-09-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-09-09 Plug Back Performed
1993-09-09 Well Fluid changed to Crude Oil
1993-09-09 Well Mode changed to Abandoned
1993-09-13 Perforation Treatment Performed - Cement Plug
1993-09-24 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-09-03 Perforation 1770.00 1771.00 13
1984-09-05 Packing Device Capped w/Cement 1767.50 1768.50 0
1984-09-05 Perforation 1758.50 1760.50 13
1984-09-05 Perforation 1761.50 1763.50 13
1984-09-06 Acid Treatment 1758.50 1763.50 0
1993-09-09 Packing Device Capped w/Cement 1741.00 1749.00 0
1993-09-13 Cement Plug 677.10 762.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 1910 0.0 0.0 0.0
1985 7430 0.0 0.0 0.0
1986 6977 0.0 0.0 0.0
1987 8189 0.0 0.0 0.0
1988 8368 0.0 0.0 0.0
1989 8493 0.0 0.0 0.0
1990 8268 0.0 0.0 0.0
1991 7828 0.0 0.0 0.0
1992 1298 0.0 0.0 0.0
1993 1 0.0 0.0 0.0

For data sources see[5]

References