If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0384233010000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.299483,"lon":-113.277998,"icon":""}]} |
Location: 00/10-30-038-23W4/0 | |
Location Alias: 00/10-30-38-23 W4M | |
Location Alias 2: 00/10-30-038-23 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 038 | |
Meridian: 4 | |
Range: 23 | |
Section: 30 | |
County/Municipality: Lacombe County | |
Well Name: LONGVIEW ALIX 10-30-38-23 | |
Operator Name: Surge Energy Inc. | |
License Number: 0082025 | |
License Date: 1980-04-08 | |
License Status: Suspension | |
Spud Date: 1980-04-07 | |
Final Drill Date: 1980-04-29 | |
Well Total Depth: 1803.00 m | |
Surface Hole Latitude: 52.299483 | |
Surface Hole Longitude: -113.277998 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1980-04-07 | Direction Drilling Operation Performed - 98 |
1980-04-08 | Obtained License |
1980-04-29 | Finished Drilling |
1980-05-01 | Drill Stem Test Performed |
1980-05-02 | Drill Stem Test Performed |
1980-05-03 | Well Log Performed |
1980-05-05 | Production Casing Operation Performed |
1980-05-05 | Well Mode changed to Drilled and Cased |
1980-08-05 | Perforation Treatment Performed - Jet Perforation |
1980-08-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1980-08-07 | Perforation Treatment Performed - Jet Perforation |
1980-08-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-02-02 | Perforation Treatment Performed - Jet Perforation |
2001-03-15 | Well Fluid changed to Gas |
2001-03-15 | Well Mode changed to Testing |
2001-03-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-03-16 | Plug Back Performed |
2001-03-16 | Well Fluid changed to Gas |
2001-03-16 | Well Log Performed |
2001-03-16 | Well Mode changed to Abandoned Zone |
2001-03-19 | Perforation Treatment Performed - Jet Perforation |
2001-03-19 | Well Log Performed |
2001-03-21 | Perforation Treatment Performed - Jet Perforation |
2001-03-21 | Well Log Performed |
2001-03-28 | Well Log Performed |
2001-03-29 | Well Log Performed |
2001-04-01 | Perforation Treatment Performed - Remedial Casing |
2001-04-02 | Perforation Treatment Performed - Remedial Casing |
2001-04-03 | Perforation Treatment Performed - Cement Plug |
2001-04-03 | Perforation Treatment Performed - Jet Perforation |
2001-04-03 | Perforation Treatment Performed - Remedial Casing |
2001-04-03 | Well Log Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1980-04-07 | 1689.00 | Conversion |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1980-08-05 | Perforation | 1753.50 | 1754.50 | 13 |
2001-04-01 | Remedial Casing Cementing | 495.90 | 533.70 | 0 |
2001-04-01 | Remedial Casing Cementing | 512.00 | 513.00 | 0 |
2001-04-02 | Remedial Casing Cementing | 351.70 | 393.30 | 0 |
2001-04-03 | Perforation | 290.00 | 291.00 | 14 |
2001-04-03 | Remedial Casing Cementing | 290.00 | 291.00 | 0 |
2001-04-03 | Cement Plug | 273.50 | 311.60 | 0 |
1980-08-05 | Perforation | 1755.50 | 1756.50 | 13 |
1980-08-07 | Packing Device Capped w/Cement | 1746.50 | 1752.00 | 0 |
1980-08-07 | Perforation | 1744.00 | 1746.00 | 13 |
1980-08-11 | Packing Device Capped w/Cement | 1730.00 | 1738.00 | 0 |
1996-02-02 | Perforation | 1498.00 | 1503.00 | 18 |
2001-03-16 | Packing Device Capped w/Cement | 1482.00 | 1490.00 | 0 |
2001-03-19 | Perforation | 512.00 | 513.00 | 13 |
2001-03-21 | Perforation | 370.00 | 371.00 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1996 | 240 | 0.0 | 0.0 | 0.0 |
For data sources see[6]