X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384231901000

Well Details

Well ID: 0384231901000
Loading map...
Location: 00/01-19-038-23W4/0
Location Alias: 00/01-19-38-23 W4M
Location Alias 2: 00/01-19-038-23 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 23
Section: 19
County/Municipality: Lacombe County
Well Name: PETROREP ET AL MIKWAN 1-19-38-23
Operator Name: Prairie Provident Resources Canada Ltd.
License Number: 0098334
License Date: 1982-10-29
License Status: RecCertified
Spud Date: 1982-10-29
Final Drill Date: 1982-11-13
Well Total Depth: 1840.00 m
Surface Hole Latitude: 52.276275
Surface Hole Longitude: -113.272223

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-10-29 Lost Circulation Occurred
1982-10-29 Obtained License
1982-11-13 Finished Drilling
1982-11-15 Drill Stem Test Performed
1982-11-15 Well Log Performed
1982-11-16 Drill Stem Test Performed
1982-11-17 Drill Stem Test Performed
1982-11-19 Production Casing Operation Performed
1982-12-20 Perforation Treatment Performed - Jet Perforation
1982-12-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-12-30 Perforation Treatment Performed - Cement Squeeze
1983-01-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-01-04 Perforation Treatment Performed - Jet Perforation
1983-01-05 Well Mode changed to Drilled and Cased
1983-08-22 Well Began Injection
1983-08-22 Well Fluid changed to Water
1983-08-22 Well Type changed to Disposal
1993-09-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-09-16 Plug Back Performed
1993-09-16 Well Fluid changed to Water
1993-09-16 Well Mode changed to Abandoned Zone
1993-09-16 Well Type changed to Disposal
1993-09-19 Perforation Treatment Performed - Jet Perforation
1993-09-26 Perforation Treatment Performed - Jet Perforation
1994-10-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-10-03 Plug Back Performed
1997-03-01 Well Abandoned
1997-03-01 Well Fluid changed to Water
1997-03-01 Well Mode changed to Abandoned
1997-03-01 Well Type changed to Disposal

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-12-20 Perforation 1325.00 1326.50 13
1982-12-21 Acid Treatment 1325.00 1326.50 0
1982-12-30 Cement Squeeze 1325.00 1326.50 0
1983-01-04 Perforation 1787.00 1789.00 13
1983-01-04 Acid Treatment 1787.00 1789.00 0
1993-09-16 Packing Device Capped w/Cement 1776.00 1780.00 0
1993-09-19 Perforation 772.00 773.00 13
1993-09-26 Perforation 1576.00 1579.00 13
1994-10-03 Packing Device Capped w/Cement 1557.00 1565.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1982-10-29 Lost Circulation 23.00 170.00

For data sources see[6]

References