X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384230708000

Well Details

Well ID: 0384230708000
Loading map...
Location: 00/08-07-038-23W4/0
Location Alias: 00/08-07-38-23 W4M
Location Alias 2: 00/08-07-038-23 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 23
Section: 07
County/Municipality: Red Deer County
Well Name: PCP MIKWAN 8-7-38-23
Operator Name: Obsidian Energy Ltd.
License Number: 0103003
License Date: 1983-09-09
License Status: Abandoned
Spud Date: 1983-11-12
Final Drill Date: 1983-12-03
Well Total Depth: 1820.00 m
Surface Hole Latitude: 52.250159
Surface Hole Longitude: -113.273569

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-09-09 Obtained License
1983-11-12 Direction Drilling Operation Performed - 98
1983-12-03 Finished Drilling
1983-12-03 Well Mode changed to Drilled and Cased
1983-12-05 Well Log Performed
1983-12-07 Production Casing Operation Performed
1984-06-03 Well Log Performed
1984-06-05 Perforation Treatment Performed - Jet Perforation
1984-06-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-06-13 Perforation Treatment Performed - Cement Squeeze
1984-06-13 Plug Back Performed
1984-06-13 Well Log Performed
1984-06-15 Perforation Treatment Performed - Jet Perforation
1984-06-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-08-03 Well Began Production
1984-08-03 Well Fluid changed to Crude Oil
1984-08-03 Well Mode changed to Pumping
1996-09-09 Perforation Treatment Performed - Jet Perforation
1996-09-12 Perforation Treatment Performed - Remedial Casing
2001-05-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-06-14 Well Fluid changed to Crude Oil
2009-06-14 Well Mode changed to Suspended
2010-06-25 Well Log Performed
2010-06-26 Well Log Performed
2010-06-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-06-28 Perforation Treatment Performed - Cement Plug
2010-06-28 Plug Back Performed
2010-06-28 Well Fluid changed to Crude Oil
2010-06-28 Well Mode changed to Abandoned Zone
2010-06-29 Well Log Performed
2010-06-30 Well Abandoned
2010-06-30 Well Fluid changed to Crude Oil
2010-06-30 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1983-11-12 781.00 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-06-05 Perforation 1787.00 1791.00 13
2010-06-28 Packing Device Capped w/Cement 1732.00 1740.00 0
2010-06-28 Cement Plug 559.80 629.30 0
2010-06-28 Packing Device Capped w/Cement 292.00 300.00 0
1984-06-13 Acid Treatment 1787.00 1791.00 0
1984-06-13 Cement Squeeze 1787.00 1791.00 0
1984-06-15 Perforation 1747.00 1750.00 13
1984-06-15 Perforation 1754.00 1756.00 13
1984-06-17 Acid Treatment 1747.00 1756.00 0
1996-09-09 Perforation 305.00 306.00 13
1996-09-12 Remedial Casing Cementing 305.00 306.00 0
2001-05-07 Acid Treatment 1747.00 1756.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 1400 0.0 0.0 0.0
1985 2948 0.0 0.0 0.0
1986 4895 0.0 0.0 0.0
1987 7844 0.0 0.0 0.0
1988 8364 0.0 0.0 0.0
1989 8497 0.0 0.0 0.0
1990 8652 0.0 0.0 0.0
1991 5983 0.0 0.0 0.0
1992 7833 0.0 0.0 0.0
1993 7398 0.0 0.0 0.0
1994 7731 0.0 0.0 0.0
1995 8174 0.0 0.0 0.0
1996 7153 0.0 0.0 0.0
1997 6878 0.0 0.0 0.0
1998 8507 0.0 0.0 0.0
1999 8049 0.0 0.0 0.0
2000 8084 0.0 0.0 0.0
2001 5826 0.0 0.0 0.0
2002 8140 0.0 0.0 0.0
2003 8255 0.0 0.0 0.0
2004 7655 0.0 0.0 0.0
2005 8312 0.0 0.0 0.0
2006 7333 0.0 0.0 0.0
2007 8429 0.0 0.0 0.0
2008 7153 0.0 0.0 0.0

For data sources see[6]

References