X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384221915000

Well Details

Well ID: 0384221915000
Loading map...
Location: 00/15-19-038-22W4/0
Location Alias: 00/15-19-38-22 W4M
Location Alias 2: 00/15-19-038-22 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 22
Section: 19
County/Municipality: Red Deer County
Well Name: LONGVIEW NEVIS 15-19-38-22
Operator Name: Surge Energy Inc.
License Number: 0111418
License Date: 1984-12-05
License Status: Suspension
Spud Date: 1985-01-22
Final Drill Date: 1985-02-01
Well Total Depth: 1850.00 m
Surface Hole Latitude: 52.288139
Surface Hole Longitude: -113.133486

For data sources see[1][2]

Well History

Date Event
1984-12-05 Obtained License
1985-01-23 Surface Casing Operation Performed
1985-02-01 Finished Drilling
1985-02-02 Well Log Performed
1985-02-03 Drill Stem Test Performed
1985-02-04 Drill Stem Test Performed
1985-02-06 Production Casing Operation Performed
1985-02-06 Rig Released
1985-02-15 Well Log Performed
1985-03-13 Perforation Treatment Performed - Jet Perforation
1985-03-13 Well Log Performed
1985-03-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-05-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-05-16 Perforation Treatment Performed - Jet Perforation
1985-05-16 Well Log Performed
1985-05-21 Perforation Treatment Performed - Jet Perforation
1985-05-31 Well Mode changed to Drilled and Cased
1988-01-12 Well Began Production
1988-01-12 Well Fluid changed to Crude Oil
1988-01-12 Well Mode changed to Flowing
1988-02-20 Well Fluid changed to Crude Oil
1988-02-20 Well Mode changed to Suspended
1988-09-19 Well Fluid changed to Crude Oil
1988-09-19 Well Mode changed to Flowing
1990-10-22 Well Fluid changed to Crude Oil
1990-10-22 Well Mode changed to Pumping
1999-10-01 Well Fluid changed to Crude Oil
1999-10-01 Well Mode changed to Suspended
2002-06-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-06-14 Plug Back Performed
2002-06-14 Well Fluid changed to Crude Oil
2002-06-14 Well Mode changed to Abandoned Zone
2002-06-15 Perforation Treatment Performed - Jet Perforation
2002-06-16 Perforation Treatment Performed - Chemical Squeeze

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-03-13 Perforation 1752.00 1754.50 10
2002-06-16 Chemical Squeeze 1540.50 1542.00 0
1985-03-13 Perforation 1758.20 1760.50 10
1985-03-14 Acid Treatment 1752.00 1760.50 0
1985-05-16 Packing Device Capped w/Cement 1749.50 1750.50 0
1985-05-16 Perforation 1739.00 1740.00 13
1985-05-21 Perforation 1729.50 1731.00 13
1985-05-21 Perforation 1732.50 1734.00 13
2002-06-14 Packing Device Capped w/Cement 1715.00 1723.00 0
2002-06-15 Perforation 1540.50 1542.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 142 0.0 0.0 0.0
1988 1374 0.0 0.0 0.0
1989 438 0.0 0.0 0.0
1990 1559 0.0 0.0 0.0
1996 3272 0.0 0.0 0.0

For data sources see[5]

References