X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384171210000

Well Details

Well ID: 0384171210000
Loading map...
Location: 00/10-12-038-17W4/0
Location Alias: 00/10-12-38-17 W4M
Location Alias 2: 00/10-12-038-17 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 17
Section: 12
County/Municipality: County of Stettler No. 6
Well Name: LOGIC ENERGY HALKIRK 10-12-38-17
Operator Name: Logic Energy Ltd.
License Number: 0122422
License Date: 1986-02-17
License Status: Suspension
Spud Date: 1986-02-26
Final Drill Date: 1986-03-03
Well Total Depth: 1285.00 m
Surface Hole Latitude: 52.254235
Surface Hole Longitude: -112.301726

For data sources see[1][2]

Well History

Date Event
1986-02-17 Obtained License
1986-02-26 Surface Casing Operation Performed
1986-03-03 Finished Drilling
1986-03-03 Well Log Performed
1986-03-03 Well Mode changed to Drilled and Cased
1986-03-04 Production Casing Operation Performed
1986-03-04 Well Log Performed
1986-03-05 Rig Released
1986-03-11 Perforation Treatment Performed - Jet Perforation
1986-03-11 Well Log Performed
1986-06-09 Well Began Production
1986-06-09 Well Fluid changed to Crude Oil
1986-06-09 Well Mode changed to Flowing
1987-01-01 Well Fluid changed to Crude Oil
1987-01-01 Well Mode changed to Suspended
1999-06-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-06-14 Plug Back Performed
1999-06-14 Well Fluid changed to Crude Oil
1999-06-14 Well Mode changed to Abandoned Zone
2000-10-12 Perforation Treatment Performed - Jet Perforation
2000-10-15 Perforation Treatment Performed - Jet Perforation
2000-10-17 Well Log Performed
2000-10-20 Well Fluid changed to Crude Oil
2000-10-20 Well Mode changed to Flowing
2000-10-21 Well Fluid changed to Crude Oil
2000-10-21 Well Mode changed to Suspended
2001-11-23 Well Fluid changed to Crude Oil
2001-11-23 Well Mode changed to Flowing
2002-02-03 Well Fluid changed to Crude Oil
2002-02-03 Well Mode changed to Pumping
2003-05-25 Perforation Treatment Performed - Jet Perforation
2003-05-26 Well Log Performed
2011-12-01 Well Fluid changed to Crude Oil
2011-12-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-03-11 Perforation 1238.00 1239.00 13
1999-06-14 Packing Device Capped w/Cement 1227.50 1236.00 0
2000-10-12 Perforation 1238.00 1239.00 17
2000-10-15 Perforation 1231.00 1234.00 17
2003-05-25 Perforation 1224.00 1228.50 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 4456 0.0 0.0 0.0
2000 25 0.0 0.0 0.0
2001 693 0.0 0.0 0.0
2002 8131 0.0 0.0 0.0
2003 8495 0.0 0.0 0.0
2004 7995 0.0 0.0 0.0
2005 8666 0.0 0.0 0.0
2006 7703 0.0 0.0 0.0
2007 2423 0.0 0.0 0.0

For data sources see[5]

References