If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0384170210000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.238741,"lon":-112.322975,"icon":""}]} |
Location: 00/10-02-038-17W4/0 | |
Location Alias: 00/10-02-38-17 W4M | |
Location Alias 2: 00/10-02-038-17 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 038 | |
Meridian: 4 | |
Range: 17 | |
Section: 02 | |
County/Municipality: County of Stettler No. 6 | |
Well Name: LOGIC ENERGY HALKIRK 10-2-38-17 | |
Operator Name: Logic Energy Ltd. | |
License Number: 0143897 | |
License Date: 1990-04-06 | |
License Status: Suspension | |
Spud Date: 1990-07-30 | |
Final Drill Date: 1990-08-03 | |
Well Total Depth: 1311.00 m | |
Surface Hole Latitude: 52.238741 | |
Surface Hole Longitude: -112.322975 |
Date | Event |
---|---|
1990-04-06 | Obtained License |
1990-07-31 | Surface Casing Operation Performed |
1990-08-03 | Finished Drilling |
1990-08-03 | Well Log Performed |
1990-08-03 | Well Mode changed to Drilled and Cased |
1990-08-04 | Production Casing Operation Performed |
1990-08-05 | Rig Released |
1990-09-01 | Well Log Performed |
1990-09-12 | Perforation Treatment Performed - Jet Perforation |
1990-09-12 | Well Log Performed |
1990-09-14 | Perforation Treatment Performed - Jet Perforation |
1990-09-14 | Well Log Performed |
1990-12-11 | Well Began Production |
1990-12-11 | Well Fluid changed to Crude Oil |
1990-12-11 | Well Mode changed to Pumping |
1999-09-01 | Well Fluid changed to Crude Oil |
1999-09-01 | Well Mode changed to Suspended |
2000-07-28 | Perforation Treatment Performed - Jet Perforation |
2009-03-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-03-16 | Plug Back Performed |
2009-03-16 | Well Fluid changed to Crude Oil |
2009-03-16 | Well Mode changed to Abandoned Zone |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1990-09-12 | Perforation | 1245.00 | 1247.00 | 13 |
1990-09-14 | Perforation | 1236.00 | 1239.00 | 13 |
1990-09-14 | Perforation | 1241.00 | 1242.00 | 13 |
2000-07-28 | Perforation | 1232.00 | 1236.00 | 20 |
2009-03-16 | Packing Device Capped w/Cement | 1218.90 | 1226.90 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1990 | 396 | 0.0 | 0.0 | 0.0 |
1991 | 8294 | 0.0 | 0.0 | 0.0 |
1992 | 8494 | 0.0 | 0.0 | 0.0 |
1993 | 8542 | 0.0 | 0.0 | 0.0 |
1994 | 8518 | 0.0 | 0.0 | 0.0 |
1995 | 8646 | 0.0 | 0.0 | 0.0 |
1996 | 8453 | 0.0 | 0.0 | 0.0 |
1997 | 7786 | 0.0 | 0.0 | 0.0 |
1998 | 1413 | 0.0 | 0.0 | 0.0 |
For data sources see[5]