X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384170209A00

Well Details

Well ID: 0384170209A00
Loading map...
Location: A0/09-02-038-17W4/0
Location Alias: A0/09-02-38-17 W4M
Location Alias 2: A0/09-02-038-17 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 17
Section: 02
County/Municipality: County of Stettler No. 6
Well Name: LOGIC ENERGY HALKIRK 9-2-38-17
Operator Name: Logic Energy Ltd.
License Number: 0140293
License Date: 1989-07-04
License Status: Suspension
Spud Date: 1989-09-19
Final Drill Date: 1989-09-23
Well Total Depth: 1287.00 m
Surface Hole Latitude: 52.238147
Surface Hole Longitude: -112.316666

For data sources see[1][2]

Well History

Date Event
1989-07-04 Obtained License
1989-09-20 Surface Casing Operation Performed
1989-09-23 Finished Drilling
1989-09-23 Well Log Performed
1989-09-23 Well Mode changed to Drilled and Cased
1989-09-24 Production Casing Operation Performed
1989-09-24 Rig Released
1989-11-23 Perforation Treatment Performed - Jet Perforation
1989-12-01 Well Began Production
1989-12-01 Well Fluid changed to Crude Oil
1989-12-01 Well Mode changed to Flowing
1990-01-05 Well Fluid changed to Crude Oil
1990-01-05 Well Mode changed to Pumping
1995-11-21 Perforation Treatment Performed - Jet Perforation
1995-11-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-11-22 Perforation Treatment Performed - Cement Squeeze
1995-11-26 Perforation Treatment Performed - Jet Perforation
1995-11-26 Well Log Performed
1996-08-09 Well Log Performed
1996-08-13 Well Log Performed
1998-05-26 Perforation Treatment Performed - Jet Perforation
1998-05-26 Well Log Performed
2001-11-01 Well Fluid changed to Crude Oil
2001-11-01 Well Mode changed to Suspended
2011-10-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-10-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-10-18 Plug Back Performed
2011-10-18 Well Fluid changed to Crude Oil
2011-10-18 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-11-23 Perforation 1229.00 1231.00 13
1995-11-21 Perforation 1234.00 1235.00 20
1995-11-22 Acid Treatment 1234.00 1235.00 0
1995-11-22 Cement Squeeze 1229.00 1235.00 0
1995-11-26 Perforation 1226.50 1228.00 18
1995-11-26 Perforation 1229.00 1230.00 18
1998-05-26 Perforation 1221.80 1227.80 17
2011-10-16 Acid Treatment 1221.80 1228.00 0
2011-10-18 Packing Device Capped w/Cement 1205.80 1213.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 635 0.0 0.0 0.0
1990 8109 0.0 0.0 0.0
1991 8409 0.0 0.0 0.0
1992 6511 0.0 0.0 0.0
1993 7026 0.0 0.0 0.0
1994 6888 0.0 0.0 0.0
1995 4500 0.0 0.0 0.0
1996 8585 0.0 0.0 0.0
1997 8437 0.0 0.0 0.0
1998 5949 0.0 0.0 0.0
1999 6211 0.0 0.0 0.0
2000 5208 0.0 0.0 0.0

For data sources see[5]

References