X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384103504020

Well Details

Well ID: 0384103504020
Loading map...
Location: 02/04-35-038-10W4/0
Location Alias: 02/04-35-38-10 W4M
Location Alias 2: 02/04-35-038-10 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 10
Section: 35
County/Municipality: County of Paintearth No. 18
Well Name: SLE PROVOST 4-35-38-10
Operator Name: SanLing Energy Ltd.
License Number: 0178679
License Date: 1995-06-19
License Status: Issued
Spud Date: 1995-06-23
Final Drill Date: 1995-06-25
Well Total Depth: 1025.00 m
Surface Hole Latitude: 52.305962
Surface Hole Longitude: -111.337028

For data sources see[1][2]

Well History

Date Event
1995-06-19 Obtained License
1995-06-24 Surface Casing Operation Performed
1995-06-25 Finished Drilling
1995-06-25 Well Log Performed
1995-06-25 Well Mode changed to Drilled and Cased
1995-06-26 Drill Stem Test Performed
1995-06-27 Drill Stem Test Performed
1995-06-27 Production Casing Operation Performed
1995-06-27 Rig Released
1995-06-29 Perforation Treatment Performed - Jet Perforation
1995-06-29 Well Log Performed
1995-07-06 Well Began Production
1995-07-06 Well Fluid changed to Crude Oil
1995-07-06 Well Mode changed to Pumping
2006-02-09 Perforation Treatment Performed - Jet Perforation
2006-06-03 Well Fluid changed to Crude Oil
2006-06-03 Well Mode changed to Suspended
2007-05-01 Well Fluid changed to Crude Oil
2007-05-01 Well Mode changed to Pumping
2007-05-31 Well Fluid changed to Crude Oil
2007-05-31 Well Mode changed to Suspended
2008-07-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-07-30 Perforation Treatment Performed - Jet Perforation
2008-07-31 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-06-29 Perforation 988.00 990.00 14
2006-02-09 Perforation 989.00 990.00 14
2006-02-09 Perforation 973.00 976.00 14
2008-07-16 Packing Device Capped w/Cement 964.00 972.00 0
2008-07-30 Perforation 827.00 829.00 17
2008-07-31 Fracture 827.00 829.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 4220 0.0 0.0 0.0
1996 8332 0.0 0.0 0.0
1997 7989 0.0 0.0 0.0
1998 8689 0.0 0.0 0.0
1999 8544 0.0 0.0 0.0
2000 8572 0.0 0.0 0.0
2001 8188 0.0 0.0 0.0
2002 8599 0.0 0.0 0.0
2003 8676 0.0 0.0 0.0
2004 8739 0.0 0.0 0.0
2005 7366 0.0 0.0 0.0
2006 3302 0.0 0.0 0.0
2007 168 0.0 0.0 0.0

For data sources see[5]

References