X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384062510000

Well Details

Well ID: 0384062510000
Loading map...
Location: 00/10-25-038-06W4/0
Location Alias: 00/10-25-38-06 W4M
Location Alias 2: 00/10-25-038-06 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 06
Section: 25
County/Municipality: Municipal District of Provost No. 52
Well Name: BOW RIVER PROVOST 10-25-38-6
Operator Name: Bow River Energy Ltd.
License Number: 0166563
License Date: 1994-04-21
License Status: RecCertified
Spud Date: 1994-10-23
Final Drill Date: 1994-10-26
Well Total Depth: 951.00 m
Surface Hole Latitude: 52.296808
Surface Hole Longitude: -110.731144

For data sources see[1][2]

Well History

Date Event
1994-04-21 Obtained License
1994-10-24 Direction Drilling Operation Performed - Deviate
1994-10-24 Surface Casing Operation Performed
1994-10-26 Finished Drilling
1994-10-26 Well Mode changed to Drilled and Cased
1994-10-27 Production Casing Operation Performed
1994-10-27 Well Log Performed
1994-10-28 Rig Released
1994-10-30 Perforation Treatment Performed - Jet Perforation
1994-11-02 Well Began Production
1994-11-02 Well Fluid changed to Crude Oil
1994-11-02 Well Mode changed to Pumping
1994-12-02 Well Log Performed
1996-10-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-10-10 Perforation Treatment Performed - Jet Perforation
1996-10-10 Perforation Treatment Performed - Remedial Casing
1996-10-10 Plug Back Performed
1996-10-10 Well Fluid changed to Crude Oil
1996-10-10 Well Mode changed to Suspended
1996-10-17 Well Abandoned
1996-10-17 Well Fluid changed to Crude Oil
1996-10-17 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1994-10-24 233.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-10-30 Perforation 897.00 898.50 26
1996-10-10 Packing Device Capped w/Cement 884.00 892.00 0
1996-10-10 Perforation 297.00 297.10 13
1996-10-10 Packing Device Capped w/Cement 284.00 300.00 0
1996-10-10 Perforation 195.00 195.30 72
1996-10-10 Perforation 195.00 195.30 72
1996-10-10 Remedial Casing Cementing 195.00 195.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 1433 0.0 0.0 0.0
1995 8667 0.0 0.0 0.0
1996 2713 0.0 0.0 0.0

For data sources see[6]

References