X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384052903002

Well Details

Well ID: 0384052903002
Loading map...
Location: 00/03-29-038-05W4/2
Location Alias: 00/03-29-38-05 W4M
Location Alias 2: 00/03-29-038-05 W4/02
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 05
Section: 29
County/Municipality: Municipal District of Provost No. 52
Well Name: PIONEER CANADA PROVOST 3-29-38-5
Operator Name: TAQA North Ltd.
License Number: 0136340
License Date: 1988-09-14
License Status: Abandoned
Spud Date: 1988-09-20
Final Drill Date: 1988-09-26
Well Total Depth: 948.00 m
Surface Hole Latitude: 52.292908
Surface Hole Longitude: -110.691827

For data sources see[1][2]

Well History

Date Event
1988-09-14 Obtained License
1988-09-21 Direction Drilling Operation Performed - Deviate
1988-09-21 Surface Casing Operation Performed
1988-09-26 Finished Drilling
1988-09-26 Well Log Performed
1988-09-26 Well Mode changed to Drilled and Cased
1988-09-27 Production Casing Operation Performed
1988-09-27 Rig Released
1988-09-30 Well Log Performed
1988-10-04 Perforation Treatment Performed - Jet Perforation
1989-11-01 Well Began Production
1989-11-01 Well Fluid changed to Crude Oil
1989-11-01 Well Mode changed to Flowing
1989-11-13 Well Log Performed
1989-11-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-11-15 Perforation Treatment Performed - Jet Perforation
1989-11-15 Plug Back Performed
1989-11-30 Well Fluid changed to Crude Oil
1989-11-30 Well Mode changed to Suspended
1995-06-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-06-14 Plug Back Performed
1995-06-14 Well Fluid changed to Crude Oil
1995-06-14 Well Mode changed to Abandoned
1995-06-19 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1988-09-21 135.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-10-04 Perforation 911.80 913.20 13
1989-11-15 Packing Device Capped w/Cement 902.00 905.00 0
1989-11-15 Perforation 897.00 898.00 13
1995-06-14 Packing Device Capped w/Cement 878.00 886.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 182 0.0 0.0 0.0

For data sources see[6]

References