X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384051905000

Well Details

Well ID: 0384051905000
Loading map...
Location: 00/05-19-038-05W4/0
Location Alias: 00/05-19-38-05 W4M
Location Alias 2: 00/05-19-038-05 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 05
Section: 19
County/Municipality: Municipal District of Provost No. 52
Well Name: ENI PROVOST 5-19-38-5
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0145296
License Date: 1990-09-05
License Status: Re-Entered
Spud Date: 1990-09-12
Final Drill Date: 1990-09-14
Well Total Depth: 899.00 m
Surface Hole Latitude: 52.280706
Surface Hole Longitude: -110.714368

For data sources see[1][2]

Well History

Date Event
1990-09-05 Obtained License
1990-09-13 Surface Casing Operation Performed
1990-09-14 Finished Drilling
1990-09-14 Well Log Performed
1990-09-14 Well Mode changed to Drilled and Cased
1990-09-15 Drill Stem Test Performed
1990-09-15 Production Casing Operation Performed
1990-09-16 Rig Released
1990-09-17 Perforation Treatment Performed - Jet Perforation
1990-09-17 Well Log Performed
1990-09-18 Perforation Treatment Performed - Remedial Casing
1990-09-19 Perforation Treatment Performed - Jet Perforation
1990-09-21 Well Began Production
1990-09-21 Well Fluid changed to Crude Oil
1990-09-21 Well Mode changed to Pumping
1990-09-27 Perforation Treatment Performed - Jet Perforation
1990-09-27 Plug Back Performed
1990-10-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-10-11 Perforation Treatment Performed - Jet Perforation
1990-10-11 Well Fluid changed to Crude Oil
1990-10-11 Well Mode changed to Abandoned Zone
1994-04-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-04-14 Plug Back Performed
1994-04-14 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-09-17 Perforation 310.00 311.00 13
1990-09-18 Remedial Casing Cementing 310.00 311.00 0
1990-09-19 Perforation 855.00 856.50 26
1990-09-27 Perforation 858.00 859.00 13
1990-10-11 Packing Device Capped w/Cement 846.00 854.00 0
1990-10-11 Perforation 844.00 846.00 13
1994-04-14 Packing Device Capped w/Cement 831.00 839.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 456 0.0 0.0 0.0

For data sources see[5]

References