If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0384051905000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.280706,"lon":-110.714368,"icon":""}]} |
Location: 00/05-19-038-05W4/0 | |
Location Alias: 00/05-19-38-05 W4M | |
Location Alias 2: 00/05-19-038-05 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 038 | |
Meridian: 4 | |
Range: 05 | |
Section: 19 | |
County/Municipality: Municipal District of Provost No. 52 | |
Well Name: ENI PROVOST 5-19-38-5 | |
Operator Name: Sinopec Daylight Energy Ltd. | |
License Number: 0145296 | |
License Date: 1990-09-05 | |
License Status: Re-Entered | |
Spud Date: 1990-09-12 | |
Final Drill Date: 1990-09-14 | |
Well Total Depth: 899.00 m | |
Surface Hole Latitude: 52.280706 | |
Surface Hole Longitude: -110.714368 |
Date | Event |
---|---|
1990-09-05 | Obtained License |
1990-09-13 | Surface Casing Operation Performed |
1990-09-14 | Finished Drilling |
1990-09-14 | Well Log Performed |
1990-09-14 | Well Mode changed to Drilled and Cased |
1990-09-15 | Drill Stem Test Performed |
1990-09-15 | Production Casing Operation Performed |
1990-09-16 | Rig Released |
1990-09-17 | Perforation Treatment Performed - Jet Perforation |
1990-09-17 | Well Log Performed |
1990-09-18 | Perforation Treatment Performed - Remedial Casing |
1990-09-19 | Perforation Treatment Performed - Jet Perforation |
1990-09-21 | Well Began Production |
1990-09-21 | Well Fluid changed to Crude Oil |
1990-09-21 | Well Mode changed to Pumping |
1990-09-27 | Perforation Treatment Performed - Jet Perforation |
1990-09-27 | Plug Back Performed |
1990-10-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1990-10-11 | Perforation Treatment Performed - Jet Perforation |
1990-10-11 | Well Fluid changed to Crude Oil |
1990-10-11 | Well Mode changed to Abandoned Zone |
1994-04-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-04-14 | Plug Back Performed |
1994-04-14 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1990-09-17 | Perforation | 310.00 | 311.00 | 13 |
1990-09-18 | Remedial Casing Cementing | 310.00 | 311.00 | 0 |
1990-09-19 | Perforation | 855.00 | 856.50 | 26 |
1990-09-27 | Perforation | 858.00 | 859.00 | 13 |
1990-10-11 | Packing Device Capped w/Cement | 846.00 | 854.00 | 0 |
1990-10-11 | Perforation | 844.00 | 846.00 | 13 |
1994-04-14 | Packing Device Capped w/Cement | 831.00 | 839.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1990 | 456 | 0.0 | 0.0 | 0.0 |
For data sources see[5]