X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384051604000

Well Details

Well ID: 0384051604000
Loading map...
Location: 00/04-16-038-05W4/0
Location Alias: 00/04-16-38-05 W4M
Location Alias 2: 00/04-16-038-05 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 05
Section: 16
County/Municipality: Municipal District of Provost No. 52
Well Name: BOW RIVER PROVOST 4-16-38-5
Operator Name: Bow River Energy Ltd.
License Number: 0163960
License Date: 1994-01-13
License Status: Suspension
Spud Date: 1994-04-26
Final Drill Date: 1994-04-29
Well Total Depth: 864.00 m
Surface Hole Latitude: 52.260634
Surface Hole Longitude: -110.670727

For data sources see[1][2]

Well History

Date Event
1994-01-13 Obtained License
1994-04-26 Well Log Performed
1994-04-27 Surface Casing Operation Performed
1994-04-29 Finished Drilling
1994-04-29 Production Casing Operation Performed
1994-04-29 Rig Released
1994-04-29 Well Log Performed
1994-04-29 Well Mode changed to Drilled and Cased
1994-05-09 Well Log Performed
1994-05-10 Perforation Treatment Performed - Jet Perforation
1994-05-10 Well Log Performed
1994-05-11 Perforation Treatment Performed - Fractured
1994-05-16 Well Began Production
1994-05-16 Well Fluid changed to Crude Oil
1994-05-16 Well Mode changed to Pumping
2007-10-13 Perforation Treatment Performed - Jet Perforation
2007-10-13 Well Log Performed
2007-10-16 Perforation Treatment Performed - Fractured
2007-10-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-10-19 Well Fluid changed to Crude Oil
2007-10-19 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-05-10 Perforation 826.50 829.00 13
1994-05-11 Fracture 826.50 829.00 0
2007-10-13 Perforation 826.50 829.00 20
2007-10-16 Fracture 826.50 829.00 0
2007-10-19 Packing Device Capped w/Cement 811.50 819.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 5468 0.0 0.0 0.0
1995 8590 0.0 0.0 0.0
1996 8623 0.0 0.0 0.0
1997 8291 0.0 0.0 0.0
1998 8487 0.0 0.0 0.0
1999 8628 0.0 0.0 0.0
2000 8655 0.0 0.0 0.0
2001 8705 0.0 0.0 0.0
2002 8711 0.0 0.0 0.0
2003 8639 0.0 0.0 0.0
2004 8678 0.0 0.0 0.0
2005 8687 0.0 0.0 0.0
2006 8735 0.0 0.0 0.0
2007 2928 0.0 0.0 0.0

For data sources see[5]

References