X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384043616000

Well Details

Well ID: 0384043616000
Loading map...
Location: 00/16-36-038-04W4/0
Location Alias: 00/16-36-38-04 W4M
Location Alias 2: 00/16-36-038-04 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 04
Section: 36
County/Municipality: Municipal District of Provost No. 52
Well Name: BOW RIVER PROVOST 16-36-38-4
Operator Name: Bow River Energy Ltd.
License Number: 0177973
License Date: 1995-05-18
License Status: Issued
Spud Date: 1995-06-16
Final Drill Date: 1995-06-18
Well Total Depth: 861.00 m
Surface Hole Latitude: 52.316883
Surface Hole Longitude: -110.435935

For data sources see[1][2]

Well History

Date Event
1995-05-18 Obtained License
1995-06-16 Surface Casing Operation Performed
1995-06-16 Well Log Performed
1995-06-17 Direction Drilling Operation Performed - Deviate
1995-06-18 Finished Drilling
1995-06-18 Well Log Performed
1995-06-18 Well Mode changed to Drilled and Cased
1995-06-19 Drill Stem Test Performed
1995-06-20 Production Casing Operation Performed
1995-06-20 Rig Released
1995-06-24 Perforation Treatment Performed - Jet Perforation
1995-06-24 Well Log Performed
1995-06-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-06-25 Perforation Treatment Performed - Jet Perforation
1995-06-25 Plug Back Performed
1995-06-25 Well Log Performed
1995-06-26 Perforation Treatment Performed - Fractured
1995-07-01 Well Began Production
1995-07-01 Well Fluid changed to Crude Oil
1995-07-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-06-17 541.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-06-24 Perforation 807.50 809.50 13
1995-06-25 Packing Device Capped w/Cement 803.00 805.00 0
1995-06-25 Perforation 796.50 798.50 13
1995-06-26 Fracture 796.50 798.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 4111 0.0 0.0 0.0
1996 8306 0.0 0.0 0.0
1997 8613 0.0 0.0 0.0
1998 8677 0.0 0.0 0.0
1999 8716 0.0 0.0 0.0
2000 8711 0.0 0.0 0.0
2001 8727 0.0 0.0 0.0
2002 8653 0.0 0.0 0.0
2003 8291 0.0 0.0 0.0
2004 8725 0.0 0.0 0.0
2005 8737 0.0 0.0 0.0
2006 8611 0.0 0.0 0.0
2007 8732 0.0 0.0 0.0
2008 8610 0.0 0.0 0.0
2009 8711 0.0 0.0 0.0
2010 8696 0.0 0.0 0.0
2011 8748 0.0 0.0 0.0
2012 8261 0.0 0.0 0.0
2013 7231 0.0 0.0 0.0
2014 6727 0.0 0.0 0.0
2015 8746 0.0 0.0 0.0
2016 8731 0.0 0.0 0.0
2017 8739 0.0 0.0 0.0
2018 8695 0.0 0.0 0.0
2019 8731 0.0 0.0 0.0
2020 2179 0.0 0.0 0.0

For data sources see[6]

References