X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384042401C03

Well Details

Well ID: 0384042401C03
Loading map...
Location: C0/01-24-038-04W4/3
Location Alias: C0/01-24-38-04 W4M
Location Alias 2: C0/01-24-038-04 W4/03
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 04
Section: 24
County/Municipality: Municipal District of Provost No. 52
Well Name: WLEC 1C0 PROVOST 1-24-38-4
Operator Name: West Lake Energy Corp.
License Number: 0131413
License Date: 1988-01-15
License Status: Issued
Spud Date: 1988-02-10
Final Drill Date: 1988-02-14
Well Total Depth: 849.00 m
Surface Hole Latitude: 52.276046
Surface Hole Longitude: -110.438690

For data sources see[1][2]

Well History

Date Event
1988-01-15 Obtained License
1988-02-11 Surface Casing Operation Performed
1988-02-14 Finished Drilling
1988-02-14 Well Log Performed
1988-02-14 Well Mode changed to Drilled and Cased
1988-02-15 Production Casing Operation Performed
1988-02-16 Rig Released
1988-02-18 Perforation Treatment Performed - Jet Perforation
1988-04-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-04-11 Perforation Treatment Performed - Jet Perforation
1988-04-11 Plug Back Performed
1994-06-16 Perforation Treatment Performed - Jet Perforation
1994-12-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-12-15 Perforation Treatment Performed - Jet Perforation
1994-12-15 Plug Back Performed
1994-12-16 Perforation Treatment Performed - Fractured
1994-12-20 Well Began Production
1994-12-20 Well Fluid changed to Crude Oil
1994-12-20 Well Mode changed to Pumping
1997-07-01 Well Fluid changed to Crude Oil
1997-07-01 Well Mode changed to Suspended
2001-07-27 Well Fluid changed to Crude Oil
2001-07-27 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-02-18 Perforation 815.00 816.00 13
1988-02-18 Perforation 816.00 817.00 13
1988-04-11 Packing Device Capped w/Cement 805.00 813.00 0
1988-04-11 Perforation 797.50 799.50 13
1994-06-16 Perforation 800.50 801.50 13
1994-12-15 Packing Device Capped w/Cement 783.00 791.00 0
1994-12-15 Perforation 772.50 775.00 13
1994-12-16 Fracture 772.50 775.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 216 0.0 0.0 0.0
1995 8756 0.0 0.0 0.0
1996 8783 0.0 0.0 0.0
1997 3959 0.0 0.0 0.0
2001 3445 0.0 0.0 0.0
2002 8744 0.0 0.0 0.0
2003 8726 0.0 0.0 0.0
2004 8434 0.0 0.0 0.0
2005 8043 0.0 0.0 0.0
2006 7903 0.0 0.0 0.0
2007 8745 0.0 0.0 0.0
2008 8655 0.0 0.0 0.0
2009 8206 0.0 0.0 0.0
2010 8048 0.0 0.0 0.0
2011 8640 0.0 0.0 0.0
2012 8675 0.0 0.0 0.0
2013 8592 0.0 0.0 0.0
2014 8620 0.0 0.0 0.0
2015 8472 0.0 0.0 0.0
2016 8335 0.0 0.0 0.0
2017 7840 0.0 0.0 0.0
2018 7088 0.0 0.0 0.0
2019 8077 0.0 0.0 0.0
2020 2156 0.0 0.0 0.0

For data sources see[5]

References