If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0384041310D00 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.270037,"lon":-110.441164,"icon":""}]} |
Location: D0/10-13-038-04W4/0 | |
Location Alias: D0/10-13-38-04 W4M | |
Location Alias 2: D0/10-13-038-04 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 038 | |
Meridian: 4 | |
Range: 04 | |
Section: 13 | |
County/Municipality: Municipal District of Provost No. 52 | |
Well Name: BOW RIVER PROVOST 10-13-38-4 | |
Operator Name: Bow River Energy Ltd. | |
License Number: 0152816 | |
License Date: 1992-06-16 | |
License Status: Abandoned | |
Spud Date: 1992-07-13 | |
Final Drill Date: 1992-07-16 | |
Well Total Depth: 876.00 m | |
Surface Hole Latitude: 52.270037 | |
Surface Hole Longitude: -110.441164 |
Date | Event |
---|---|
1992-06-16 | Obtained License |
1992-07-14 | Surface Casing Operation Performed |
1992-07-16 | Drill Stem Test Performed |
1992-07-16 | Finished Drilling |
1992-07-16 | Well Log Performed |
1992-07-16 | Well Mode changed to Drilled and Cased |
1992-07-17 | Production Casing Operation Performed |
1992-07-17 | Rig Released |
1992-07-21 | Perforation Treatment Performed - Jet Perforation |
1992-08-01 | Well Began Production |
1992-08-01 | Well Fluid changed to Crude Oil |
1992-08-01 | Well Mode changed to Pumping |
1996-10-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-10-09 | Plug Back Performed |
1996-10-09 | Well Fluid changed to Crude Oil |
1996-10-09 | Well Mode changed to Suspended |
1997-05-22 | Well Abandoned |
1997-05-22 | Well Fluid changed to Crude Oil |
1997-05-22 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1992-07-21 | Perforation | 851.00 | 852.00 | 13 |
1996-10-09 | Packing Device Capped w/Cement | 838.00 | 846.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1992 | 3594 | 0.0 | 0.0 | 0.0 |
1993 | 7765 | 0.0 | 0.0 | 0.0 |
1994 | 4920 | 0.0 | 0.0 | 0.0 |
1995 | 8590 | 0.0 | 0.0 | 0.0 |
1996 | 3479 | 0.0 | 0.0 | 0.0 |
For data sources see[5]