X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384032906D00

Well Details

Well ID: 0384032906D00
Loading map...
Location: D0/06-29-038-03W4/0
Location Alias: D0/06-29-38-03 W4M
Location Alias 2: D0/06-29-038-03 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 03
Section: 29
County/Municipality: Municipal District of Provost No. 52
Well Name: WESCAN ENERGY PROVOST 6-29-38-3
Operator Name: Wescan Energy Corp.
License Number: 0138834
License Date: 1989-02-17
License Status: Issued
Spud Date: 1989-02-20
Final Drill Date: 1989-02-23
Well Total Depth: 853.00 m
Surface Hole Latitude: 52.295054
Surface Hole Longitude: -110.399320

For data sources see[1][2]

Well History

Date Event
1989-02-17 Obtained License
1989-02-21 Surface Casing Operation Performed
1989-02-23 Finished Drilling
1989-02-24 Well Log Performed
1989-02-25 Production Casing Operation Performed
1989-02-25 Rig Released
1989-03-02 Well Log Performed
1989-03-04 Perforation Treatment Performed - Jet Perforation
1989-03-07 Well Mode changed to Drilled and Cased
1989-05-22 Well Began Production
1989-05-22 Well Fluid changed to Crude Oil
1989-05-22 Well Mode changed to Pumping
1990-03-02 Well Log Performed
1990-06-29 Perforation Treatment Performed - Cement Squeeze
1990-07-03 Perforation Treatment Performed - Jet Perforation
1990-07-03 Well Log Performed
1990-07-09 Well Began Injection
1990-07-09 Well Fluid changed to Water
1990-07-09 Well Type changed to Disposal
1990-07-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-08-23 Perforation Treatment Performed - Jet Perforation
1998-12-05 Perforation Treatment Performed - Jet Perforation
1998-12-08 Well Fluid changed to Water
1998-12-08 Well Type changed to Disposal

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-03-04 Perforation 821.00 823.50 13
1990-06-29 Cement Squeeze 821.00 823.50 0
1990-07-03 Perforation 831.00 834.50 13
1990-07-12 Acid Treatment 831.00 834.50 0
1991-08-23 Perforation 823.00 824.50 13
1998-12-05 Perforation 827.00 830.00 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 5232 0.0 0.0 0.0
1990 4117 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

References