X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384030703002

Well Details

Well ID: 0384030703002
Loading map...
Location: 00/03-07-038-03W4/2
Location Alias: 00/03-07-38-03 W4M
Location Alias 2: 00/03-07-038-03 W4/02
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 03
Section: 07
County/Municipality: Municipal District of Provost No. 52
Well Name: ACL PROVOST 3-7-38-3
Operator Name: Battle River Energy Ltd.
License Number: 0150680
License Date: 1991-11-18
License Status: Issued
Spud Date: 1992-08-24
Final Drill Date: 1992-08-26
Well Total Depth: 879.00 m
Surface Hole Latitude: 52.248424
Surface Hole Longitude: -110.422185

For data sources see[1][2]

Well History

Date Event
1991-11-18 Obtained License
1992-08-25 Surface Casing Operation Performed
1992-08-26 Finished Drilling
1992-08-26 Well Log Performed
1992-08-26 Well Mode changed to Drilled and Cased
1992-08-27 Production Casing Operation Performed
1992-08-27 Rig Released
1994-03-05 Perforation Treatment Performed - Jet Perforation
1998-09-18 Perforation Treatment Performed - Jet Perforation
1998-09-18 Well Log Performed
1998-09-20 Perforation Treatment Performed - Fractured
1998-09-30 Well Began Production
1998-09-30 Well Fluid changed to Crude Oil
1998-09-30 Well Mode changed to Pumping
1999-08-25 Well Log Performed
1999-09-01 Well Fluid changed to Crude Oil
1999-09-01 Well Mode changed to Suspended
2005-10-03 Well Log Performed
2005-10-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-10-04 Perforation Treatment Performed - Jet Perforation
2005-10-04 Plug Back Performed
2005-10-04 Well Fluid changed to Crude Oil
2005-10-04 Well Log Performed
2005-10-04 Well Mode changed to Abandoned Zone
2005-10-26 Perforation Treatment Performed - Fractured
2011-11-03 Perforation Treatment Performed - Cement Squeeze
2011-11-03 Plug Back Performed
2011-11-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-11-09 Perforation Treatment Performed - Cement Squeeze
2011-11-09 Plug Back Performed
2011-11-12 Perforation Treatment Performed - Jet Perforation
2011-11-13 Perforation Treatment Performed - Cement Squeeze
2011-11-18 Perforation Treatment Performed - Jet Perforation
2011-11-18 Well Log Performed
2012-12-17 Well Began Injection
2012-12-17 Well Fluid changed to Water
2012-12-17 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-03-05 Perforation 752.50 753.00 13
2011-11-12 Perforation 804.00 806.30 13
2011-11-13 Cement Squeeze 804.00 806.30 0
2011-11-18 Perforation 817.00 821.00 17
1998-09-18 Perforation 804.00 806.30 13
1998-09-20 Fracture 804.00 806.30 0
2005-10-04 Packing Device Capped w/Cement 792.00 800.00 0
2005-10-04 Perforation 695.50 698.00 17
2005-10-26 Fracture 695.50 698.00 0
2011-11-03 Cement Squeeze 695.50 698.00 0
2011-11-09 Acid Treatment 752.50 753.00 0
2011-11-09 Cement Squeeze 752.50 753.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 1636 0.0 0.0 0.0
1999 6120 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

References